accession architects chronology date description document type drawer drawing number notes plan type project size source title
M1 HBO+EMTB Drawing No: A04 28/07/2009 Reflected Ceiling Plan - Humffray Room First Level and Ground Floor document 3 A04
preliminary stage 1 Full plan
Floor Plan - Humffray Room Reflected Ceiling Plan - Ground and First Floor
M2 HBO+EMTB A01 28/07/2009 Ground Level Demolition Plan plan original 3 A01 Related copies M46 & 67. working stage 1 Full plan
Site Plan. Demolition Plan - Ground Level
M3 HBO+EMTB A02 28/07/2009 Demolition Plans First and Second Levels plan original 3 A02 Endorsed Document
Heritage Victoria Permit No: P14869.

Related documents M47 Working Plan & M68 City of Ballarat Approved Plan : 27/10/09, BS-1364.
working stage 1 Full plan
Demolition Plans First and Second Levels
M4 HBO+EMTB A03 28/07/2009 New Works - Ground and First Levels plan original 3 A03 Endorsed Document
Heritage Victoria Permit No: P14869
.
M65 is Preliminary Drawings dated:
11th July 2009,
2nd & 15th July 2009.



working stage 1 Full plan
New Works - Ground and First Levels
M5 HBO+EMTB AO4 28/07/2009 Second Floor Plan - New Works. Roof Plan above OME Room. Ceiling Plan - OME Room. Ground Level Reflected Ceiling Plan plan original 3 A04 Endorsed Document
Heritage Victoria Permit No: P14869.
working stage 1 Full plan
Second Floor Plan - New Works. Roof Plan above OME Room. Ceiling Plan - OME Room.
Ground Level Reflected Ceiling Plan
M6 HBO+EMTB A05 28/07/2009 First Level Reflected Ceiling Plan. Building Sections plan original 3 A05 Endorsed Document
Heritage Victoria Permit No: P14869
M49 & M70 are copies of this record.
working stage 1 Full plan
First Level Reflected Ceiling Plan. Building Sections
M7 HBO+EMTB A06 28/07/2009 Building Sections. Construction Details plan original 3 A06 Endorsed Document
Heritage Victoria Permit No: P14869
M50 & M71 are copies of this record.
working stage 1 Full plan
Building Sections. Construction Details
M8 HBO+EMTB A07 28/07/2009 Construction Details Sheet 1
Detail: Roof; Stair & Balustrade.
plan original 3 A07 'Detail-Roof' is a mirror image of the drawing on Plan M51, related copy - M72. working stage 1 Full plan
Construction Details Sheet 1
M9 HBO+EMTB A08 28/07/2009 Construction Details Sheet 2
Details: Step Ramp: Stair; Door Jamb; Spiral Stair (Ground Floor & First Floor); and Batten Room Doors.
plan original 3 A08 M51 is a copy of this drawing with alterations to 'Detail-Stair'. working stage 1 A1
Construction Details - Sheet 2
M10 HBO+EMTB A09 28/07/2009 Door Schedule - Joinery Details Document Approved 3 A09 City of Ballarat approved - 27 October 2009.
BS - 1364.
This is an approved copy of M66.
approved stage 1 Full plan
Door Schedule - Joinery Details
M11 HBO+EMTB A10
Proposed Back Stage & Store. Exisitng Conditions - Floor Plans.
Ground Level - Existing; Auditorium - Existing.
plan original 3 ATP001
working stage 1 Full plan
Proposed Back Stage & Store.
Existing Conditions - Floor Plans
M12 HBO+EMTB A11 28/07/2009 Works Stage "2" Plans
Ground & First Level
plan original 3 A11 City of Ballarat Approved 27 October 2009.
BS - 1364.
working stage 1 A1
Works Stage '2' Plans
M13 Cosgriff & Assoc. P/L H-1 1/06/2009 Hydraulic Services Sewer Layout - Ground and First Floor Existing Conditions plan original 3 H-1
working stage 1 Full plan
Hydraulic Services Sewer Layout - Ground and First Floor - Existing Conditions
M14 Cosgriff & Assoc. P/L E-1 1/6/2009 Electrical Services - Ground and First Floor Layout Existing Conditions plan original 3 E-1
working stage 1 Full plan
Electrical Services Ground and First Floor Layout - Existing Conditions
M15 Cosgriff & Assoc. P/L E-2 1/6/2009 Electrical Services - Second Floor Layout, Existing Conditions plan original 3 E-2 Endorsed Document P14869.
1 October 2009.
HO987.
Related copy
working stage 1 Full plan
Electrical Services - Second Floor Layout, Existing Conditions
M16 Cosgriff & Assoc. P/L E-3 1/6/2009 Electrical Services - Ground and First Floor Layout - Lighting Layout plan original 3 E-3 M62 is a site copy of this original plan. working stage 1 Full plan
Electrical Services - Ground and First Floor Layout - Lighting Layout
M17 Cosgriff & Assoc. P/L E-4 1/06/2009 Electrical Services - Ground and First Floor Layout - Power and Communications Layout plan original 3 E-4 City of Ballarat Approved 27 October 2009.
BS-1364.
This is a second copy of M63.
working stage 1 Full plan
Electrical Services - Ground and First Floor Layout - Power and Communications Layout
M18 Cosgriff & Assoc. P/L M-1 1/6/2009 Mechanical Services - Ground Floor Layout
Includes: Mechanical Services Legend and Equipment Schematic Legend
plan original 3 M-1 Endorsed Document P14869.
1 October 2009.
HO987.
working stage 1 Full plan
Mechanical Services - Ground Floor Layout
M19 HBO+EMTB SE1 1/7/2009 Ground Floor Plan and Notes
Notes include: General, Concrete, Reinforcing, Structural Timber and Masonry
plan original 3 SE1
working stage 1 Full plan
Ground Floor Plan and Notes
M20 HBO+EMTB SE2 1/7/2009 First and Second Floor Plans plan original 3 0945 SE2 Endorsed copy P14869. HO987.
Related copies M75 & M91.
working stage 1 Full plan
First and Second Floor Plans
M21 Morton Dunn WDA01 1/11/2006 Demolition Ground & First Floor Plan
Endorsed Document P11348 - 18 January 2007.
plan original 3 WDA01 Related copy M218 approved stage 1 Full plan
Demolition Ground & First Floor Plans
M22 Morton Dunn WDA02 1/11/2006 Demolition Second & Third Floor Plans
Endorsed Document P11348.
plan original 3 WDA02
approved stage 1 Full plan
Demolition Second & Third Floor Plans
M23 Morton Dunn WDA03 1/11/2006 Demolition - Sections a - Cutaway View.
- Section b & c - Cutaway Highlighting Stairwell.
Demolition Detail a - Stairs.
Endorsed Document P 11348 18/1/2007

plan original 3 WDA 03
approved stage 1 Full plan
Demolition Sections
M24 Morton Dunn WDA 04 1/11/2006 Proposed Ground and First Floor Plans
Endorsed Document P11348, 18/1/2007

plan original 3 WDA 04 Related copy M217. approved stage 1 Full plan
Proposed Ground and First Floor Plans
M25 Morton Dunn WDA 05 1/11/2006 Proposed Second and Third Floor Plans
Endorsed Document - P11348, 18/1/2007
plan original 3 WDA 05
approved stage 1 Full plan
Proposed Second and Third floor Plans
M26 Morton Dunn WDA 06 1/11/2006 Reflected Ceiling Plans - ground, first and third floor
Endorsed Document - P11348, 18/1/2007
plan original 3 WDA 06
approved stage 1 Full plan
Reflected Ceiling Plans
M27 Morton Dunn WDA 07 1/11/2006 Elevations - North ( external) , West (external) and South
Sections - elevation cutaway, north elevation tea room
plan original 3 WDA 07 This is a related copy of M210. working stage 1 Full plan
Elevations and Sections
M28 Morton Dunn WDA 08 1/11/2006 Section C - internal stairway cutaway
Section D - internal stairway with new landing
Section E - internal cutaway
Roof Plan
Endorsed Document P11348, 18/1 2007
plan original 3 WDA 08
approved stage 1 Full plan
Sections and Roof Plan
M29 Morton Dunn WDA 09 1/11/2006 Internal Elevations - North stairs, South stairs
Endorsed Document P11348, 18/1/2007
plan original 3 WDA 09
approved stage 1 Full plan
Internal Elevations 1
M30 Morton Dunn WDA 10 1/11/2006 Internal Elevations - west stairs, level 1, lift foyers levels 0-3
Stair Plans ground floor, first floor, second floor, third floor.
Endorsed Document P11348 18/1/07
plan original 3 WDA 10
approved stage 1 Full plan
Internal Elevations 2 & Stair Plans
M31 Morton Dunn WDA 11 1/11/2006 Internal Elevations 3
- Tea Room
- Staff WC
- Lift Foyer Ground Floor
Endorsed Document P11348 18/1/07
plan original 3 WDA 11
approved stage 1 Full plan
Internal Elevations 3
M32 Morton Dunn WDA 12 28/11/2006 Internal Elevations 4 & Details
- Sutton Room
Endorsed Document P11348 18/1/07
plan original 3 WDA 12
approved stage 1 Full plan
Internal Elevations 4 & Details
M33 MacLeod Consulting S01 1/08/2006 Face Sheet and Standard Notes
Endorsed Document P11348 18/1/07
plan original 3 S01
approved stage 1 Full plan
Face Sheet and Standard Notes
M34 MacLeod Consulting S02 1/08/2006 Ground and First Floor Level Works
Endorsed Document P11348 18/1/07
plan original 3 S02 Related copy M214. approved stage 1 Full plan
Ground and First Floor Level Works
M35 MacLeod Consulting S03 1/08/2006 Second and Third Floor Level Works
Endorsed Document P11348 18/1/07
plan original 3 S03
approved stage 1 Full plan
Second and Third Floor Level Works
M36 MacLeod Consulting S04 1/08/2006 Building Sections
plan original 3 S04 Endorsed Document P11348 18/1/07.
Related copy M216.
working stage 1 Full plan
Building Sections
M37 MacLeod Consulting S05 1/08/2006 Typical Details
Stair Sections and Pump Notes
Endorsed Document P11348 18/1/07
plan original 3 S05
approved stage 1 Full plan
Typical Details
M38 Cosgriff & Assoc. P/L M-1 1/11/2006 Mechanical Services Ventilation Layout
Ground, First, Second, Third Floors - Part Floor Plans
Includes Mechanical Services Legend
Endorsed Document P11348 18/1/07
plan original 3 M-1
approved stage 1 Full plan
Mechanical Services Ventilation Layout
M39 Cosgriff & Assoc. P/L
1/11/2006 Electrical Services - Lighting, Power & Fire Detection Layouts
Ground Floor and First Floor. Includes Lighting Legend
Endorsed Document P11348 18/1/07
plan original 3 E-1
approved stage 1 Full plan
Electrical Services - Lighting, Power & Fire Detection Layouts
Ground Floor and First Floor
M40 Cosgriff & Assoc. P/L E-2 1/11/2006 Electrical Services. Lighting, Power & Fire Detection Layouts Second Floor, Third Floor and Basement.
Basement Part Floor Plan. Stairway North Elevation
Endorsed Document P11348 18/1/07
plan original 3 E-2
approved stage 1 A1
Electrical Services. Lighting, Power & Fire Detection Layouts Second Floor, Third Floor and Basement
M41 Cosgriff & Assoc. P/L E-3 1/11/2006 Electrical Services Schematic Diagrams
Electrical Single Line Diagram
Endorsed Document P11348 18/1/07
plan original 3 E-3
approved stage 1 Full plan
Electrical Services Schematic Diagrams
M42 Cosgriff & Assoc. P/L H-1 1/11/2006 Hydraulic Services Sewer Layout
Ground, First, Second & Third Floor Part Floor Plans
Includes Sewer Legend
Endorsed Document P11348 18/1/07
plan original 3 H-1
approved stage 1 Full plan
Hydraulic Services Sewer Layout
M43 Cosgriff & Assoc. P/L H-2 1/11/2006 Hydraulic Services
Cold Water, Domestic Hot Water. & Hose Reel Layouts
- Meter Detail
- Domestic Hot Water Piping Schematic
- Basement and First Floor Part Floor Plans
Domestic Hot Water and Cold Water Notes
Endorsed Document P11348 18/1/07
plan original 3 H-2
approved stage 1 Full plan
Hydraulic Services C.W., D.H.W. & Hose Reel Layouts
M44 Cosgriff & Assoc. P/L H-3 1/11/2006 Hydraulic Services
Cold Water, Domestic .Hot. Water & Hose Reel Layouts
First and Second Floor Part Floor Plans
Endorsed Document P11348 18/1/07
plan original 3 H-3
approved stage 1 Full plan
Hydraulic Services C.W., D.H.W. & Hose Reel Layouts
M45 Cosgriff & Assoc. P/L H-4 1/11/2006 Hydraulic Services
Cold Water, Domestic .Hot Water. Tempered Warm Water & Fire Hose Reel Schematics
Endorsed Document P11348 18/1/07
plan original 3 H-4
approved stage 1 Full plan
Hydraulic Services
C.W., D.H.W. Tempered Warm Water & Fire Hose Reel Schematics
M46 HBO+EMTB A01 28/07/2009 Site Plan with alterations.
Demolition Plan - Ground Level
Site Copy 3 A01 There are two related copies M2 & M67. working stage 1 Full plan
Site Plan
Demolition Plan - Ground Level
M47 HBO+EMTB A02 28/07/2009 Demolition Plans - First and Second Floors
Site Copy with alterations
Site Copy 3 A02 Copy of Endorsed original plan (M3).
M68 is a City of Ballarat Approved copy.
27/10/2009. BS 1364.
working stage 1 Full plan
Demolition Plans
First and Second Levels
M48 HBO+EMTB A04 28/07/2009 Second Floor Plan - New Works
Roof Plan above OME Room
Ceiling Plan - OME Room
Ground Level Reflected Ceiling Plan
Site Copy with alterations
Site Copy 3 A04
working stage 1 Full plan
Second Floor Plan - New Works
Roof Plan above OME Room
Ceiling Plan - OME Room
Ground Level Reflected Ceiling Plan
M49 HBO+EMTB A05 28/07/2009 First Level Reflected Ceiling Plan
Building Sections
Site Copy with alterations
Site Copy 3 A05 This is a Site Copy of M6 & M70. working stage 1 Full plan
First Level Reflected Ceiling Plan
Building Sections
Building Sections
M50 HBO+EMTB A06 28/07/2009 Building Sections
Construction Details
Site Copy with alterations
Site Copy 3 A06 This is a site copy of M7 & M71. working stage 1 Full plan
Building Sections
Constructions Details
M51 HBO+EMTB A07 28/07/2009 Construction Details - Sheet 1
Copy with alterations
Site Copy 3 A07 Endorsed Document P14869.
1 October 2009.
.Detail-Roof' on this drawing is a mirror image of drawing on Plan M8. Related record - M72.
working stage 1 Full plan
Construction Details - Sheet 1
M52 HBO+EMTB
28/07/2009 Construction Details - Sheet 2
includes: step ramp; details stair; detail GD09; detail door jamb; section-step ramp; detail stair; plan/step ramp; spiral stair ground floor plan; spiral stair first floor plan; detail-doors to Batten Room.
Copy with Alterations
Site Copy 3 A08 'Detail Stair' on this drawing shows inclusion of: 'Concrete footing and brick dwarf wall to engineers detail'
Related copies M9 & M73.
working stage 1 Full plan
Construction Details - Sheet 2
M53 HBO+EMTB
11/06/2009 Demolition Plans First and Second Floors
plan original 3 A02
preliminary stage 1 Full plan
Demolition Plans First and Second Floors
M54 HBO+EMTB
28/07/2009 Works Stage "1" Plans
Ground level; First level; OME Roof
Copy of original
Site Copy 3 A10 Site copy of original
Related copies - M74 & M89.
working stage 1 Full plan
Works Stage '1' Plans
M55 HBO+EMTB
28/07/2009 Works Stage '2' Plans
Plan-Ground Level; Plan-First Level
Site Copy 3 A11 Endorsed Document P14869.
1 October 2009.
HO987.
working stage 1 Full plan
Works Stage '2' Plans
M56 HBO+EMTB
29/07/2009 Ground Floor Plan and Notes Site Copy 3 0945 SE1 Endorsed Document P14869.
1 October 2009.
HO987.
working stage 1 Full plan
Ground Floor Plan and Notes
M57 HBO+EMTB
28/07/2009 First & Second Floor Plans
First Floor Plan includes Revison A
Site Copy 3 0945 SE2 Site copy of original - includes Revision A. working stage 1 Full plan
First & Second Floor Plans
M58 HBO+EMTB
28/07/2009 Member Schedule & Structural Details
Site Copy 3 0945 SE3 Endorsed Document P14869.
1 October 2009.
HO987.
working stage 1 Full plan
Member Schedule & Structural Details
M59 HBO+EMTB
28/07/2009 Structural Details Site Copy 3 0945 SE4 Endorsed Document P14869.
1 October 2009.
HO987.
working stage 1 Full plan
Structural Details
M60 Cosgriff & Assoc. P/L E-1 1/06/2009 Ground & First Floor Layout Existing Conditions, Demolition and Relocation Work Site Copy 3 E-1
working stage 1 Full plan
Ground & First Floor Layout Existing Conditions, Demolition and Relocation Work
M61 Cosgriff & Assoc. P/L E-2 1/06/2009 Electrical Services Second Floor Layout - Existing Conditions
Site Copy 3 E-2 City of Ballarat Approved - 27 October 2009.
BS1364.
Second copy of M15.
approved stage 1 Full plan
Electrical Services Second Floor Layout - Existing Conditions
M62 Cosgriff & Assoc. P/L E-3 1/06/2009 Electrical Services Ground and First Floor Layout
Lighting and Fire Detection Layout
Site Copy 3 E-3 Endorsed Document P14869.
1 October 2009.
HO987.
Related copy M80.
working stage 1 Full plan
Electrical Services Ground and First Floor Layout
Lighting and Fire Detection Layout
M63 Cosgriff & Assoc. P/L E-4 1/06/2009 Electrical Services - Ground and First Floor Layout - Power and Communications Site Copy 3 E-4 This is a site copy of the original M17 with alterations. working stage 1 Full plan
Electrical Services - Ground and First Floor Layout - Power and Communications
M64 Cosgriff & Assoc. P/L H-1 1/06/2009 Hydraulic Services - Ground and First Floor Proposed Layout plan original 3 H-1 Endorsed Document P14869
1 October 2009
Related Record M81.
working stage 1 Full plan
Hydraulic Services - Ground and First Floor Proposed Layout
M65 HBO+EMTB
11/06/2009 New Works - Ground & First Floor Plans document 3 A03 City of Ballarat Approved 27 October 2009
BS-1364.
preliminary
Full plan
New Works - Ground & First Floor Plans
M66 HBO+EMTB
28/07/2009 Door Schedule - Joinery Details Document Approved 3 A09 City of Ballarat Approved - 27 October 2009. BS-1364.
Damaged copy - torn top left hand corner.
approved stage 1 Full plan
Door Schedule - Joinery Details
M67 HBO+EMTB
28/07/2009 Site Plan Demolition Plan - Ground Level Document Approved 3 A01 City of Ballarat Approved 27 October 2009
BS-1364.
Related copies M2 & M46.
approved stage 1 Full plan
Site Plan Demolition Plan - Ground Level
M68 HBO+EMTB
28/07/2009 Demolition Plans First and Second Levels Document Approved 3 A02 City of Ballarat Approved copy of M3 & M47.
27/10/09 BS-1364.
approved stage 1 Full plan
Demolition Plans First and Second Levels
M69 HBO+EMTB
28/07/2009 Second Floor Plan - New Works Roof Plan above OME Room
Ceiling Plan - OME Room
Ground Level Reflected Ceiling Plan
Document Approved 3 A04 Approved copy of M5 & M48.
City of Ballarat Approved 27/10/09.
BS-1364.
approved stage 1 Full plan
Second Floor Plan - New Works
Roof Plan above OME Room
Ceiling Plan - OME Room
Ground Level Reflected Ceiling Plan
M70 HBO+EMTB
28/07/2009 First Level Reflected Ceiling Plan
Building Sections
Document Approved 3 A05 City of Ballarat Approved copy of M6 & M49.
27/10/09 BS-1364.
approved stage 1 Full plan
First Level Reflected Ceiling Plan
Building Sections
M71 HBO+EMTB
28/07/2009 Building Sections Construction Details Document Approved 3 A06 City of Ballarat Approved copy of M7 & M50.
27/10/09 BS-1364.
approved stage 1 Full plan
Building Sections Construction Details
M72 HBO+EMTB
28/07/2009 Construction Details - Sheet 1 Document Approved 3 A07 City of Ballarat Approved copy of M8 and M51.
27/10/09 BS-1364.
Related records - M8 & M51.
approved stage 1 Full plan
Construction Details - Sheet 1
M73 HBO+EMTB
28/07/2009 Construction Details - Sheet 2 Document Approved 3 A08 City of Ballarat Approved copy of M51.
27/10/09 BS-1364. Related copy M9.
approved stage 1 Full plan
Construction Details - Sheet 2
M74 HBO+EMTB
28/07/2009 Works Stage "1" Plans Document Approved 3 A10 City of Ballarat Approved 27 October 2009.
BS-1364.
This is an Approved copy of Site Copy M54.
Related copy M89 ( Preliminary).
approved stage 1 Full plan
Works Stage "1" Plans
M75 HBO+EMTB
28/07/2009 First and Second Floor Plans Document Approved 3 0945 SE2 .City of Ballarat Approved 27 October 2009.
BS-1364.
Related copies M20 & M91.
approved stage 1 Full plan
First and Second Floor Plans
M76 HBO+EMTB
01/07/2009 Member Schedule & Structural Details Document Approved 3 0945 SE3 City of Ballarat Approved 27 October 2009.
BS-1364.
This is a second copy of M58.
approved stage 1 Full plan
Member Schedule & Structural Details
M77 HBO+EMTB
01/07/2009 Structural Details Document Approved 3 0945 SE4 City of Ballarat Approved 27 October 2009.
BS-1364.
approved stage 1 Full plan
Structural Details
M78 Cosgriff & Assoc. P/L
01/07/2009 Mechanical Services - Ground Floor Layout Document Approved 3 M-1 City of Ballarat Approved 27 October 2009.
BS-1364.
This is a second copy of M18.
approved stage 1 Full plan
Mechanical Services - Ground Floor Layout
M79 Cosgriff & Assoc. P/L
01/06/2009 Electrical Services - Ground and First Floor Layout Existing Conditions, Demolition and Relocation Work. Document Approved 3 E-1 City of Ballarat Approved 27 October 2009.
BS1364.
Related copy M83.
approved stage 1 Full plan
Electrical Services - Ground and First Floor Layout Existing Conditions,
Demolition and Relocation Work.
M80 Cosgriff & Assoc. P/L
01/06/2009 Electrical Services - Ground and First Floor Layout
Lighting and Fire Detection Layout.
Document Approved 3 E-3 City of Ballarat Approved 27 October 2009.
BS1364.
Related copy M62.
approved stage 1 Full plan
Electrical Services Ground and First Floor Layout
Lighting and Fire Detection Layout.
M81 Cosgriff & Assoc. P/L
01/06/2009 Hydraulic Services - Ground and First Floor Proposed Layout. Document Approved 3 H-1 City of Ballarat Approved - 27 October 2009.
BS-1364.
Related record M64 - Endorsed.
approved stage 1 Full plan
Hydraulic Services
Ground and First Floor Proposed Layout
M82 HBO+EMTB
28/07/2009 Door Schedule Joinery Details plan original 3 A09 Endorsed Document P14869.
1 October 2009.
HO987.
working stage 1 Full plan
Door Schedule Joinery Details
M83 Cosgriff & Assoc. P/L
01/06/2009 Electrical Services Ground and First Floor Layout Existing Conditions, Demolition and Relocation Work. plan original 3 E-1 Endorsed Document P14869.
1 October 2009.
HO987.
Related copy M79.
working stage 1 Full plan
Electrical Services
Ground and First Floor Layout Existing Conditions,
Demolition and Relocation Work.
M84 HBO+EMTB
11/06/2009 First Floor Reflected Ceiling Plan - Building Sections - Building Sections
Reflected Ceiling Plan First Floor; Section OME Batten Room; Proposed Ladder and Balustrade; Detail - Ladder; Detail - Rainwaterhead; Detail - East Light Court; Details Section.
plan original 3 A05
preliminary stage 1 Full plan
First Floor Reflected Ceiling Plan - Building Sections - Building Sections
M85 HBO+EMTB
15/07/2009 Construction Details
Detail - Roof; Detail - Door Jamb; New Curved Wall - Plan; Detail - Balustrade/Stair; Section Through Curved Wall.
plan original 3 A07
preliminary stage 1 Full plan
Construction Details
M86 HBO+EMTB
11/06/2009 Construction Details
Plan - Step Ramp; Section - Step Ramp; Section Through Step Ramp; Detail - Stair; Detail - GD09; Detail - Door Jamb;
Detail - Doors to Batten Room; Spiral Stair - Ground and First Floor.
plan original 3 A08
preliminary stage 1 Full plan
Construction Details
M87 HBO+EMTB
2/07/2009 Door Schedule Joinery Details
Door Jamb - GO1 & GO2; Door Jamb - GD14; Library Circulation Area - Joinery; Library Circulation Area.
plan original 3 A09 Related Plans M10, M66 & M82.
Pencil note "Repair existing gates - fit new hardware".
preliminary stage 1 Full plan
Door Schedule Joinery Details
M88 HBO+EMTB
01/07/2009 Structural Details
Includes Legend 1 -14 Structural Steel.
plan original 3 0945 SE4 City of Ballarat Approved 27 October 2009. BS-1364.
Related copies M59 & M77.
working stage 1 Full plan
Structural Details
M89 HBO+EMTB
15/7/2009 Works Stage "1" Plans plan original 3 A10 Related copies M54 & M74. preliminary stage 1 Full plan
Works Stage "1" Plans
M90 HBO+EMTB
01/07/2009 Ground Floor Plan & Notes plan original 3 0945 SE1
Related copy M56. approved stage 1 Full plan
Ground Floor Plan & Notes
M91 HBO+EMTB
01/07/2009 First and Second Floor Plans plan original 3 0945 SE2. Related copies M20 & M75. approved stage 1 Full plan
First and Second Floor Plans
M92 HBO+EMTB

Schematic Design Proposed Back Stage & Store Plans
Ground Level Proposed & Auditorium Proposed.
plan original 3 TP002
working stage 1 Full plan
Schematic Design
Proposed Back Stage & Store Plans
M93 HBO+EMTB

Proposed Back Stage & Store Existing Conditions Floor Plans
Ground Level Existing
Auditorium Existing
plan original 3 TP001 Related copy M94 preliminary stage 1 Full plan
Proposed Back Stage & Store
Existing Conditions Floor Plans
M94 HBO+EMTB

Proposed Back Stage & Store Existing Conditions Floor Plans
Ground Level Existing Auditorium Existing
plan original 3 TP001 Related record M93 - Preliminary working stage 1 Full plan
Proposed Back Stage & Store
Existing Conditions Floor Plans
M95 HBO+EMTB

Proposed Back Stage & Store Elevations & Sections
South Elevation - Existing Conditions
South Elevation - Proposed Back Stage Store
Section - Back Stage Store
Section - Walkway/Link.
plan original 3 TP003
working stage 1 Full plan
Proposed Back Stage & Store
Elevations & Sections
M96

11/12/2009 Mezzanine Floor plan original 3 10-001-SJW_BMI_OME Includes "Item" Legend. working stage 1 Full plan
Mezzanine Floor
M97 HBO+EMTB
11/06/2009 New Works Ground & First Floor Plans plan original 3 A03
working stage 1 Full plan
New Works Ground & First Floor Plans
M98 HBO+EMTB

Reflected Ceiling Plan - Ground & First Floor Building Elevation 3
Ome Ceiling
Reflected Ceiling Plan - OME Mezzanine
Building Section
plan original 3 A05
preliminary stage 1 Full plan
Reflected Ceiling Plan - Ground & First Floor Building Elevation 3
M99 HBO+EMTB

Site Plan & Ground Level Demolition Plans
Plan - Site Plan
Plan - Ground Level
Demolition Legend
plan original 3 A01
preliminary stage 1 Full plan
Site Plan & Ground Level Demolition Plans
M100 HBO+EMTB

Demolition First & Second Floor plan original 3 A01
preliminary stage 1 Full plan
Demolition First & Second Floor
M101 HBO+EMTB

Site Plan & Ground Level Demolition Plan
Demolition Legend included.
General Notes included.
plan original 3 A01
preliminary stage 1 Full plan
Site Plan & Ground Level Demolition Plan
M102 HBO+EMTB

Details & Sections
New Ramp Detail
plan original 3 A06
preliminary stage 1 Full plan
Details & Sections
M103 HBO+EMTB

Building Section RFL - First Floor Roof Detail
Reflected Ceilng Plan - First Floor
Roof Detail
Building Section
plan original 3 A05
preliminary stage 1 Full plan
Building Section RFL - First Floor Roof Detail
M104 HBO+EMTB

Reflected Ceiling Plan - Ground & OME Mezzanine & Roof Plan
plan original 3 A04
preliminary stage 1 Full plan
Reflected Ceiling Plan - Ground & OME Mezzanine & Roof Plan
M105 HBO+EMTB
11/06/2009 New Works Second Floor Plan Ground Floor Reflected Ceiling Plan plan original 3 A04
preliminary stage 1 Full plan
New Works Second Floor Plan
Ground Floor Reflected Ceiling Plan
M106 HBO+EMTB

Demolition, First Level Humffray Room Roof OME plan original 3 A02
preliminary stage 1 Full plan
Demolition, First Level Humffray Room Roof OME
M107 HBO+EMTB
11/06/2009 Building Sections plan original 3 A06 Related record M36. preliminary stage 1 Full plan
Building Sections
M108 HBO+EMTB
11/06/2009 Demolition Plans First and Second Floors plan original 3 A02 Related record M53. preliminary stage 1 Full plan
Demolition Plans First and Second Floors
M109 HBO+EMTB
11/06/2009 Section Details 1 plan original 3 A07
preliminary stage 1 Full plan
Section Details 1
M110 HBO+EMTB
11/06/2009 Details
Details - Stair: New Curved Wall - Plan; Section Through New Curved Wall; New Gate Details.
plan original 3 A08
preliminary stage 1 Full plan
Details
M111 HBO+EMTB
11/06/2009 OME Roof Plan Reflected Ceiling Plan Auditorium Reflected Ceiling Plan
Reflected Ceiling Plan - First Floor
Reflected Ceiling Plan OME Room
Section - OME
Detail - Roof
Rainwaterhead Detail
Section - OME & Batten Room
plan original 3 A05
preliminary stage 1 Full plan
OME Roof Plan Reflected Ceiling Plan Auditorium Reflected Ceiling Plan
M112 HBO+EMTB

Demolition Plan - Third Floor
New Works Plan - Ground Floor
plan original 3 A02 NOTE: NO TITLE FOR THIS DRAWING. preliminary stage 1 Full plan
Demolition Plan
M113

16/11/2009 The Works Program - Mechanics Institute Stage 2 plan original 3

preliminary stage 2 Full plan
The Works Program - Mechanics Institute Stage 2
M114

01/01/2005 Central Highlands Water - Facilities Mapping System
NOTE: Details of sewage easement rear of BMI and Unicorn.
plan original 3
NOTE: Contains details of sewage easement rear of BMI and Unicorn. sewage
A4
Central Highlands Water - Facilities Mapping System
M115

15/09/1999 Plan of Drainage - The Ballaarat Mechanics Institute Nos. 113-121 Sturt Street
(Agent: Messrs J.H. Brown & Son, 107 Doveton Street South)
plan copy 2
Copy obtained from Central Highlands Water 15/9/99. sewage
A3
Ballarat Sewerage Authority - Master Plan - Sewerage Area No.3
M116

21/11/1957 Plan of Drainage - No. 125 & rear of 123-125 The Ballarat Mechanics Institute.
plan original 2
Sewage Line for highlighted shop belongs to the BMI. sewage stage 1

Ballarat Sewerage Authority - Plan of Drainage
M117 J.H. Jones
28/05/1869 Plans: Steps to Platform & Plan of Footway in Cutters. plan original 2
Note on Plan reads "Plan referred to in agreement Dated June 9th 1869. Taylor & Ellis". (Contractors of Ballarat).
stage 1 A3
Mechanics Institute - Plans for Steps to Platform & Footway in Cutters.
M118 J.H. Jones
28/05/1869 Plan - Platform and Staircase
Section on A.B.
plan original 2
Note on Plan - Plan referred to in agreement Dated June 9th 1869. Taylor & Ellis (Contractors of Ballarat).
stage 1

Mechanics Institute - Platform and Staircase
Section on A.B.
M119 J.H. Jones
18/01/1869 Mezzanine Floor. plan original 2


stage 1 A4
Mechanics Institute - Mezzanine Floor.
M120 J.H. Jones
09/06/1869 Mechanics Institute - Verandahs. plan original 2
Plan referred to in agreement Dated 9th June 1869. Taylor & Ellis. (Contractors of Ballarat).
stage 1 A3
Mechanics Institute - Verandahs
M121 J.H. Jones
28/05/1869 Mechanics Institute - Staircase and Platform
Side Elevation
Platform Plan
Plan of Stairs
Front Elevation.
plan original 2
Plan referred to in agreement Date the 9th June 1869. Taylor & Ellis (Contractors of Ballarat).
stage 1 Full plan
Mechanics Institute - Staircase and Platform
M122 J.H. Jones

Mechanics Institute - Staircase from Hall Level to Gallery & Museum. plan original 2



A3
Mechanics Institute - Staircase from Hall Level to Gallery & Museum.
M123


Mechanics Institute - plan showing separate Ladies & Gentlemens Retireing Rooms and Elevation. plan original 2


stage 1 A3
Mechanics Institute - Retireing Rooms.
M124 J.H. Jones
11/09/1868 Girder Details Mechanics' Institute.
Cast Iron Girders
Gallery Girder
plan original 2
One of the plans referred to in agreement dated September 26, 1868. Jonathon Coulson Contractor of Ballarat.
stage 1

Girder Details Mechanics' Institute.
M125


Plan of Basement, Ground Floor Plan & Front Elevation to correct Former Plan. plan original 2


stage 1 A3
Mechanics Institute - Plan of Basement, Ground Plan & Front Elevation to correct Former Plan.
M126 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 Proposed Building Conservation, and Development.
Sturt Street Verandah to Facade.
plan original 2 B133.1.7

stage 1

Proposed Building Conservation, and Development.
M127 J.H. Jones
18/11/1968 Mechanics Institute of Ballarat - Platform in Hall. plan original 2
Plan submitted but not carried out. preliminary stage 1 Full plan
Mechanics Institute - Platform in Hall.
M128 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 Proposed Building Conservation, and Development.
Sturt Street Facade - Front Elevation.
plan original 4 B133.1.7 One of the plans referred to agreement dated September 26th, 1868.
Jonathon Coulson.

This is a larger version of M126 showing the full facade of the BMI.
preliminary stage 1 Full plan
The Ballarat Mechanics Institute - Proposed Building Conservation, and Development.
Sturt Street Facade - Front Elevation.
M129 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 proposed Building Conservation, and Development.
Ground Floor Plan.
plan original 4 B133.1.2
working stage 1 Full plan
Proposed Building Conservation, and Development - Ground Floor Plan.
M130 Coburn & Associates
01/06/1964 Proposed New Verandah. plan original 4

working stage 1 Full plan
Mechanics Institute Sturt Street Ballarat
Proposed New Verandah
M131 Messrs Cowper Murphy & Assoc.
01/06/1954 Proposed Alterations to the Brittannia Theatre Sturt Street for Greater Union Theatres Pty. Ltd. plan original 4

approved stage 1 Full plan
Proposed Alterations to the Brittannia Theatre Sturt Street Ballarat for Greater Union Theatres P/L.
M132 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 Proposed Building Conservation, and Development
Ground Floor Plan
plan original 4 B133.1.2
working stage 1 A0
Proposed Building Conservation, and Development
Ground Floor Plan
M133 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 Proposed Building Conservation, and Development
First Floor Plan
plan original 4 B133.1.3
working stage 1

Proposed Building Conservation, and Development
First Floor Plan
M134 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 Proposed Building Conservation, and Development
Second Floor Plan
plan original 4 B133.1.4
working stage 1

Proposed Building Conservation, and Development
Second Floor Plan
M135 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 Proposed Building Conservation, and Development
Third Floor Plan
plan original 4 B133.1.5
working stage 1 A1
Proposed Building Conservation and Development
Third Floor Plan
M136 J.H. Jones
01/11/1968 Roof Plan plan original 4
One of the Plans referred to in agreement dated September 26, 1868 - Jonathon Coulson.
working stage 1

Ballarat Mechanics Institute
Roof Plan
M137 J.H. Jones
28/05/1869 Staircase and Platform Plan plan copy 4
Plan referred to in agreement dated the 9th June 1869. Taylor & Ellis. working stage 1

Staircase and Platform Plan
M138


Staircase from Hall Level to Gallery & Museum. plan copy 4


stage 1

Staircase from Hall Level to Gallery & Museum.
M139 Jack H. Greer
26/01/1935 SKETCH - Part of Crown Allotment 2, Section 13
City and Parish of Ballaarat County of Grenville.
Ground Level sketch shows Unicorn Hotel, Bicycle Shop, Library Area and noting Shops 123-7.
plan copy 4
Jack H. Greer Licensed Surveyor 26/1/35.
Note: Inside measurement 49x 3.5
non-current
A3
SKETCH - Part of Crown Allotment 2, Section 13
City and Parish of Ballaarat County of Grenville.
M140


Plan of Basement - Ground Plan - Front Elevation.
plan copy 4
Drawing makes note that the underground flues can be provided for the offices by carrying them down the walls into the basement.
stage 1 A2
Plan of Basement
M141 Clegg & Morrow

Proposed Show Window Sturt Street
Plan shows Front Elevation and Entrance Door details.
plan copy 4
Blueprint drawing. non-current
A3
Proposed Show Window Sturt Street
M142 Gaylord Bros, Inc.
03/01/1936 Proposed Plan 1 & 2 of Library
Library Plans - Old Mining Exchange
plan original 4 1 Plan is signed by John G. Matthews. non-current


Proposed Plan 1 & 2 of Library
Library Plans - Old Mining Exchange
M143

11/11/1937 Ground Floor and Mezzanine Floor Drawings plan copy 4
Stamp on drawing states CHW accepts no responsibility for any inaccuracies on the plan.
Drawing contains a lot of hand-written detail.
non-current stage 1 A3
Ground Floor and Mezzanine Floor Drawings.
M144 Coburn & Associates
01/06/1964 Proposed New Verandah
Plan shows detail B.2. to C.I.R.C.2
Detail 1, 2 & 3.
North Elevation and Plan of Vernadah Lining.
plan copy 4


stage 1 Full plan
Proposed New Verandah
M145


Detail Balcony
Floor of Library & Balcony, Half Section & Elevation.
plan copy 4


stage 1 Full plan
Detail Balcony Mechanics Institute
M146 J.H. Jones
11/09/1868 Mechanics Institute Gallery Plan No. 5. plan copy 4
Handwritten note signed by Jonathon Coulson "one of the plans referred to in agreement dated September 26th, 1868". non-current
Non-Standard
Mechanics Institute Gallery Plan No. 5.
M147 J.H. Jones
11/09/1868 Girder Details Mechanics Institute
Cast Iron Girders.
plan copy 4
Handwritten Note signed by Jonathon Coulson "one of the plans referred to in agreement dated September 26th 1868. non-current
Non-Standard
Mechanics Institute Girder Details
M148 J.H. Jones
03/03/1869 Mechanics Institute Detail of Roof plan copy 4
Handwritten Note says Memo Tracing given to Thomas & Cook - March 4th, 1869. non-current
Non-Standard
Mechanics Institute Detail of Roof
M149 J.H. Jones
07/09/1869 Mechanics Institute - Brass Guard-Bars
One for each Front
plan copy 4

non-current
Non-Standard
Mechanics Institute - Brass Guard-Bars
One for each Front
M150 J.H. Jones
11/09/1868 Mechanics Institute Roof Plan No. 7. plan copy 4
Handwritten Note - "One of the plans referred to in agreement dated September 26, 1868". non-current
Non-Standard
Mechanics Institute Roof Plan No. 7.
M151 Clegg & Morrow
01/06/1942 Lavatory, Accommodation for the Ballarat Mechanics Institute, Sturt Street. plan copy 4

non-current
A4
Lavatory, Accommodation for the Ballarat Mechanics Institute, Sturt Street.
M152 J.H. Jones
28/05/1869 Mechanics Institute Platform and Staircase
Section on A.B.
plan copy 4
Handwritten Note - Plan referred to in agreement dated June 9th, 1869. Taylor & Ellis. non-current
Non-Standard
Mechanics Institute Platform and Staircase
Section on A.B.
M153

21/11/1957 Ballarat Sewerage Authority - Plan of Drainage.
Detail Plan No 24. Drainage Plan No. 247.
plan copy 4
Plan is stamped - Officer in Charge House Connections. 25 February 1958. non-current
Non-Standard
Ballarat Sewerage Authority - Plan of Drainage.
M154 Messrs Cowper Murphy & Assoc.

Proposed Alterations to Mechanics Institute - Schemes 2 and 3
Scheme 2: Longitudinal Section; Seating Plan; Circle Foyer Floor Plan; Ground Floor Plan
Scheme 3: Longitudinal Section; Dress Circle Plan; Second Floor Plan; First Floor Plan; Ground Floor Plan
plan original 4
Historic Note: Stairs to roof and observation tower with decorative lace work (external) shown on Longitudinal Section. non-current
Non-Standard
Proposed Alterations to Mechanics Institute Ballarat - Schemes 2 and 3
M155 J.H. Jones
28/05/1869 Steps to Platform & Plan of Footway in Gutters. plan copy 4
Handwritten note: Plan referred to in agreement dated June 9th 1869.
Taylor & Ellis.
non-current
Non-Standard
Mechanics Institute - Steps to Platform & Plan of Footway in Gutters
M156


New Verandah: Mechanics Institute Sturt Street Ballarat.
Plan features Perspective (Facade) & Floor Plan of Foyer, Office & Shops and new verandah over.
plan copy 4

non-current
Full plan
New Verandah: Mechanics Institute Sturt Street Ballarat.
M157


Reinstatement of Mechanics Institute Hall plan copy 2
Plan stamped Public Health Department No. 03630 17 July 1915. non-current stage 1 Full plan
Reinstatement of Mechanics Institute Hall




M158


Detail Balcony - Mechanics Institute
Detailing Floor of Library and Floor of Balcony.
Half Plan & Half Section and Elevation.
plan original 2


stage 1 Non-Standard
Detail Balcony - Mechanics Institute
M159 J.H. Jones

Mechanics Institute - Detail of Front of Roof. plan original 2
Note on Plan: Trusses built on site of oregon beams. They were shipped to Melbourne, then on to Geelong, then carted to Ballarat. non-current stage 1 Non-Standard
Mechanics Institute - Detail of Roof
M160 Messrs Cowper Murphy & Assoc.

Proposed Alterations to Mechanics Institute Ballarat
Circle Foyer Floor Plan - Scheme 2
plan original 2

non-current stage 2 Non-Standard
Proposed Alterations to Mechanics Institute Ballarat
M161


Mechanics Institute - Details of Entrance - Quarter Full Size plan original 2


stage 1 Full plan
Mechanics Institute - Details of Entrance - Quarter Full Size
M162 J.H. Jones

Mechanics Institute - Sketch of Step with ---ing - Cut Bracket plan original 2

non-current stage 1 Non-Standard
Mechanics Institute - Sketch of Step with ---ing - Cut Bracket.
M163

28/11/1906 Type "A" Iron Porticoes for the City of Ballaarat
- Showing Detail of Elevation, Skylight, Frieze, Barge & Cap, Section Through Girder, Step in Verandah & Spandrel Filling, Section through Pillar and Plan of Base of Pillar.

plan original 2
Gazetted 28/11/1906.
Note: Reverse side of Plan has floor plan for the Municipal Offices.
non-current stage 1 Non-Standard
Type "A" Iron Porticoes for the City of Ballaarat
M164 J.H. Jones
07/09/1969 Mechanics Institute - Brass Guard-Bars one for each Front plan original 4
Drawing shows Elevation Plan and Section.
Handwritten note: 2nd copy.
non-current
Non-Standard
Mechanics Institute - Brass Guard-Bars one for each Front
M165 Gaylord Bros, Inc.
28/12/1935 Ballarat Mechanics Institute - Charging Desk.
4 1 Blueprint drawing showing desk compartments, front panelling and floor plan. non-current
A1
Ballarat Mechanics Institute - Charging Desk
M166 Coburn & Associates
01/03/1964 Odeon Theatre Drawing - Perspective of Facade
Drawing of New Verandah for Mechanics Institute
plan copy 4

preliminary
Non-Standard
Drawing for Odeon Theatre
Drawing of new Verandah for Mechanics Institute.
M167


Mechanics Institute Facade plan copy 4

preliminary stage 1 Non-Standard
Mechanics Institute Facade
M168

11/06/1969 Mechanics Institute Entry Design Sketch of Cornice and Light plan copy 4

preliminary stage 1 Non-Standard
Mechanics Institute Entry Design Sketch of Cornice and Light.
M169


Sketch of Basement Windows plan copy 4

preliminary stage 1 Non-Standard
Sketch of Basement Windows
M170

29/06/1969 Mechanics Institute Cornice Sketch plan copy 4

preliminary stage 1 Non-Standard
Mechanics Institute Cornice Sketch
M171


Sketch of Fountain for Mechanics Institute plan copy 4

preliminary stage 1 Non-Standard
Sketch of Fountain for Mechanics Institute
M172


Sketch of Skirting for Mechanics Institute plan copy 4


stage 1 Non-Standard
Sketch of Skirting for Mechanics Institute
M173

01/01/1934 New Library Mechanics Institute
Plan of Proposed Library in Stock Exchange Building
plan original 4
Proposed plan only - never built as such. preliminary stage 1 Non-Standard
Plan of Proposed Library in Stock Exchange Building titled New Library Mechanics Institute.
M174 Messrs Cowper Murphy & Assoc.

Proposed Alterations to Mechanics Institute Ballarat
Ground Floor Plan - Scheme 2
plan copy 4

non-current stage 1 Non-Standard
Proposed Alterations to Mechanics Institute Ballarat
Ground Floor Plan - Scheme 2
M175


Mechanics Institute Ballarat - Elevation of Table plan original 4

non-current stage 1 Non-Standard
Mechanics Institute Ballarat - Elevation of Table





M176

28/05/1941 Britannia Theatre - Ballarat
Mechanics Institute Buildings
Plan - Circle Entrance - East Side - Scale 1/2" = 1 foot.
plan copy 4

non-current stage 1 Non-Standard
Britannia Theatre - Ballarat
Mechanics Institute Buildings
Plan - Circle Entrance - East Side - Scale 1/2" = 1 foot.
M177 Messrs Cowper Murphy & Assoc.

Survey Plan of Mechanic's Institute Ballaarat
Stalls Floor Plan
plan copy 4

non-current stage 1 Non-Standard
Survey Plan of Mechanic's Institute Ballaarat
Stalls Floor Plan
M178 Messrs Cowper Murphy & Assoc.

Survey Plan Mechanics Institute Ballaarat
Gallery Plan
plan copy 4

non-current stage 1 Non-Standard
Survey Plan Mechanics Institute Ballaarat
Gallery Plan
M179


Mechanics Instituteof Ballarat - Detail Plan of Shelves
Elevation of Shelves, Partition between Shelves, Moulding on face of Shelves.
plan copy 4


stage 1 Non-Standard
Mechanics Institute of Ballarat - Detail Plan of Shelves
Elevation of Shelves, Partition between Shelves, Moulding on face of Shelves.
M180 L.H. Vernon & Associates. Pty Ltd.
22/10/1997 Proposed Building Conservation and Development
Basement Plan
plan copy 4 B133.1.1
non-current stage 1 Non-Standard
Proposed Building Conservation and Development
Basement Plan
M181


Ballarat Mechanics Institute
Ground Floor Plan
plan copy 4

non-current stage 1 Non-Standard
Ballarat Mechanics Institute
Ground Floor Plan
M182


Ballarat Mechanics Institute
First Floor Plan
plan copy 4

non-current stage 1 Non-Standard
Ballarat Mechanics Institute
First Floor Plan
M183


Ballarat Mechanics Institute
Second Floor Plan
plan copy


non-current stage 1 Non-Standard
Ballarat Mechanics Institute
Second Floor Plan
M184

11/06/1869 Drawing of Ceiling Light plan copy 4


stage 1 Non-Standard
Drawing of Ceiling Light
M185

01/01/1868 Sketch of Step - with awning - cut Bracket etc drawing hand 4

non-current
Non-Standard
Sketch of Step - with awning - cut Bracket etc
M186

06/02/1869 Mechanics Institute - Cornice over Mezzanine Floor plan copy 4


stage 1 Non-Standard
Mechanics Institute - Cornice over Mezzanine Floor
M187


Sketch of Elaborate Cornice - showing face of work plan copy 4

non-current stage 1 Non-Standard
Sketch of Elaborate Cornice - showing face of work
M188 Messrs Cowper Murphy & Assoc.

Survey Plan Mechanics Institute Ballaarat
Longitudinal Section showing Stage, Auditorium and Dancing School
plan copy 4

non-current stage 1 Non-Standard
Survey Plan Mechanics Institute Ballaarat
Longitudinal Section showing Stage, Auditorium and Dancing School
M189 J.H. Jones
25/05/1869 Sketch of Ornamental Cornice and Elaborate surround of window. plan copy 4

non-current stage 1 Non-Standard
Sketch of Ornamental Cornice and Elaborate surround of window.
Plaster Mould
M190

11/08/1869

4



Non-Standard
Half Size sketch of Cornice and elaborate Stair Railings
M191


Sketch of Elaborate Cornice plan copy 4

non-current stage 1 Non-Standard
Sketch of Elaborate Cornice - Plaster Mould
M192

29/06/1869 Sketch of Cornice plan copy 4

non-current
Non-Standard
Sketch of Cornice
M193

17/05/1869 Sketch including Cup Mould plan copy 4


stage 1 Non-Standard
Sketch including Cup Mould
M194


"Plan of Platform including Stairs" - Ballarat Mechanics Institute. plan copy 4

non-current stage 1 Non-Standard
"Plan of Platform including Stairs" - Ballarat Mechanics Institute.
M195


Mechanics Institute - Details of Entrance - Quarter Full Size plan copy 4

non-current stage 1 Non-Standard
Mechanics Institute - Details of Entrance
M196


Plan for Mechanics Institute including Ground Floor
First Floor with two offices in front and a hall at back
Gallery Floor with Billiards Room above

4

non-current stage 1 Non-Standard
Plan for Mechanics Institute including Ground Floor
First Floor with two offices in front and hall at back
Gallery Floor with Billiard Room above
M197


Early plan of Mechanics Institute Hall - featuring Stage, Inspection Chamber and Exit from Stalls. plan copy 4

non-current
Non-Standard
Early plan of Mechanics Institute Hall.
M198

01/01/1868 Early Building Plan of Mechanics Institute - Ground, First and Gallery Floors. plan copy 4

non-current
Non-Standard
Early Building Plan of Mechanics Institute - Ground, First and Gallery Floors.
M199

01/01/1919 Plan of Top Floor of the Britannia Theatre
4

non-current
Non-Standard
Plan of Top Floor of the Britannia Theatre
M200 Clegg & Morrow

Ballarat Mechanics Institute - Annexe of Backstage over the footpath
Features Dressing Rooms, Stage and Auditorium.
plan copy 4

non-current
Non-Standard
Ballarat Mechanics Institute - Annexe of Backstage over the footpath
Features Dressing Room, Stage and Auditorium
M201


Sketch of Elaborate Plaster Mould plan copy 4

non-current stage 1 Non-Standard
Sketch of Elaborate Plaster Mould
M202


View of Shelves in Relation to Lighting Fitting.
Sketch of Proposed Fitting for Library.
plan copy 4
Coloured Sketches.
Note at base of sketches - State Electricity Commission of Victoria.
Electricity Supply Department - Electrical Development Branch.
non-current stage 1 Non-Standard
View of Shelves in Relation to Lighting Fitting.
Sketch of Proposed Fitting for Library.
M203 Messrs Cowper Murphy & Assoc.

Proposed Alterations to Mechanics Institute Ballarat - Scheme 2.
New Section to Roof, Bio Box, Auditorium, Foyer, Reading Room, Corridor & Entrance Foyer.
plan original 4


stage 1 Non-Standard
Proposed Alterations to Mechanics Institute Ballarat - Scheme 2.
M204 HBO+EMTB
19/05/2009 Proposed Back Stage - Store & Access
Auditorium Level
Auditorium
Auditorium Ramp
Access Ramp
Ref. No: 001093
plan copy 4 F-01 M204a & M204b show more detail of the auditorium - Drawing No: SKO4.
Related record - M206.
preliminary theatre A4
Proposed Back Stage - Store & Access
M205 Morton Dunn
10/10/2011 Plan of Feature & Level Survey plan copy 4 FS01-01 NOTE: Adam Edward Criddle of TGM Group 1315 Sturt Street Ballarat 3350, certify that this plan is in all respects accurate conditions on the 10-10-2011.
Licensed Surveyor.
preliminary stage 2 A3
Plan of Feature & Level Survey
M206 HBO+EMTB
01/01/2009 Proposed Access Ramp to Back Stage - Plan Option B
Drawings: SK-05 and SK-06. Ref: 001093
drawing hand 4 SK-05 & SK-06 M206a - Plan Option B. Drwg: SK-05
M206b - Section A-A Option B. Drwg: SK-06
Related Record - M204.
preliminary theatre A3
Proposed Access Ramp to Back Stage - Option B
M207 Morton Dunn
01/11/2006 Sections & Roof Plan plan copy 4 WDA 08 This is a related copy of M28 Endorsed copy. preliminary stage 1 Full plan
Sections & Roof Plan
M208 Morton Dunn
01/11/2006 Internal Elevations 1 plan copy 4 WDA 09 This is a preliminary copy of M29 Endorsed copy preliminary stage 1 Full plan
Internal Elevations 1
M209 Morton Dunn
01/11/2006 Reflected Ceiling & Roof Plans plan original 4 WDA 06 Related copy of M26 Endorsed Plan. preliminary stage 1 Full plan
Reflected Ceiling & Roof Plans
M210 Morton Dunn
01/11/2006 Sections
Elevation - North (external), West (external), & South Sections - Elevation Cutaway, North Elevation Tea Room.
plan original 4 WDA 07 This is a related copy of M27. preliminary stage 1 Full plan
Sections
M211 Morton Dunn
01/11/2006 Internal Elevations 2 & Stair Plans
Lift Foyer - Floor Level 1, Internal Elevation - stairs, Lift Foyers Levels 0 - 3, Stair Plans - ground floor, first floor, second floor, third floor.
plan original 4 WDA 10 Related copy M30 - Endorsed. preliminary stage 1 Full plan
Internal Elevations 2 & Stair Plans
M212 Morton Dunn
01/11/2006 Internal Elevations 3
- Tea Room
- Staff WC
- Lift Foyer - Ground Floor, Floor Leval 1a
- South Foyer 2, East Foyer 2, North Foyer 2,
- Female WC
east (a), east (b), south (a), south (b),
Male WC
South dis. WC, west, north, Tea Room 2,
Auditorium
plan original 4


stage 1 Full plan
Internal Elevations 3
M213 Morton Dunn
28/11/2006 Internal Elevations 4 & Details plan original 4 WDA 12
preliminary stage 1 Full plan
Internal Elevations 4 & Details
Sutton Room
M214 MacLeod Consulting
01/08/2006 Ground and First Floor Level Works plan original 4 S02 Related copy M34. preliminary stage 1 Full plan
Ground and First Floor Level Works
M215

01/08/2006 Second and Third Floor Level Works plan original 4 S03
preliminary stage 1 Full plan
Second and Third Floor Level Works
M216 MacLeod Consulting
01/08/2006 Building Sections plan original 4 S04 Related copy M36. preliminary stage 1 Full plan
Building Sections
M217 Morton Dunn
01/11/2006 Proposed Ground & First Floor Plans plan original 4 WDA 04 Related copy M24. preliminary stage 1 Full plan
Proposed Ground & First Floor Plans
M218 Morton Dunn
01/11/2006 Demolition Ground & First Floor Plans plan original 4 WDA 01 Related copy M21. preliminary stage 1 Full plan
Demolition Ground & First Floor Plans
M219

11/04/1868 Mechanics Institute Alterations and Additions to Plans plan original 4
Archives record 13911 - handwritten notes re drawing and printed "Competitive Designs" for the new building to be erected on the frontage to Sturt Street are invited under the following conditions.
Original drawing in maps drawer,
preliminary stage 1 Non-Standard
Mechanics Institute Alterations and Additions to Plans
M220 MacLeod Consulting
01/05/2011 Alterations and additions to stage area for Ballarat Mechanics Institute
Structural Drawings S01-S07.
plan copy 4 S01-S07 Twelve pages to this entry. non-current theatre A3
Alterations and additions to stage area for Ballarat Mechanics Institute
M221 HBO+EMTB

Ballarat Mechanics Institute Proposed Back Stage Store & Access plan copy 4 SKO4
non-current theatre A4
Ballarat Mechanics Institute Proposed Back Stage Store & Access
M222 Morton Dunn
19/10/2011 Existing first floor plan
Drawing of BMI Auditorium and Stage area
plan copy 4 EC-01 Related Record M223 non-current theatre A3
Ballaarat Mechanics' Institute
Existing first floor plan of Auditorium and Stage
M223 Morton Dunn
19/10/2011 Proposed First Floor Plan
M223a - option 1
M223b - option 2
M223c - option 3
plan copy 4 SK-01-03 Related Record M222 non-current theatre A3
Ballaarat Mechanics' Institute
Proposed First Floor Plan - options 1, 2, 3
M224 Wendy Jacobs
01/03/2004 Mechanics Institute Ballarat
Heating System - Panel Radiation Layout
plan copy 4 08019 - M1
non-current stage 1 A3
Mechanics Institute Ballarat
Heating System - Panel Radiation Layout
M225 Wendy Jacobs
01/03/2004 Mechanics Institute Ballarat
Heating System - Details
plan copy 4 08019 - M2
non-current stage 1 A3
Mechanics Institute Ballarat
Heating System - Details
M226 Wendy Jacobs
01/03/2004 Mechanics Institute Ballarat
Heating System - Pipe Schematic
plan copy 4 08019 - M3
non-current stage 1 A3
Mechanics Institute Ballarat
Heating System - Pipe Schematic
M227 Wendy Jacobs
01/03/2004 Mechanics Institute Ballarat
Heating System - Legend & Notes
plan copy 4 08019 - M4
non-current stage 1 A3
Mechanics Institute Ballarat
Heating System - Legend & Notes
M228 HBO+EMTB

Ballarat Mechanics Institute
Floor Plan Ground & First Level
plan copy 4 A03 Job No: MEA-1093 preliminary stage 1 Full plan
Ballarat Mechanics Institute
Floor Plan Ground & First Level
M229 Morton Dunn

Mechanics Institute Ballarat
Ground Floor Plan
First Floor Plan
plan copy 4

preliminary stage 1 Non-Standard
Mechanics Institute Ballarat
Ground Floor Plan
First Floor Plan
M230 Morton Dunn

Ballarat Mechanics Institute
Plan of South Elevation
plan copy 4

preliminary stage 1 Non-Standard
Ballarat Mechanics Institute
Plan of South Elevation
M231 Morton Dunn

Ballarat Mechanics Institute
Section Drawing - Section CC
Section Drawing - Section BB
plan copy

Section CC shows Auditorium, Service Area & Courtyard.
Section BB shows New Back Stage & Auditorium.
preliminary stage 1

Ballarat Mechanics Institute
Section Drawing Section CC
Section Drawing Section BB
M232




4



Non-Standard
Ballarat Mechanics Institute
M233 Morton Dunn
14/10/2011 Ballarat Mechanics Institute
Internal Elevations (existing) - East, South & West.
plan copy 4


stage 1 Non-Standard
Ballarat Mechanics Institute
Internal Elevations (existing) - East, South & West.
M234 Morton Dunn

Ballarat Mechanics Institute
Proposed Option A Plan
Proposed Option B Plan
Proposed Option A Elevation
Proposed Option B
plan copy 4

non-current stage 1 Full plan
Ballarat Mechanics Institute
Proposed Option A Plan
Proposed Option B Plan
Proposed Option A Elevation
Proposed Option B
M235 W. Baragwanath 1.0 01/12/1911 Cover envelope containing 32 Plates Map, Sections, and Plans. The Ballarat Gold-Field, Memoir No. 14 Historical Geological Survey 7 cover Missing from Cover envelope. Plate no. 7A, 11, 19, 20, 29. Geological Survey Geological Survey A4 Unknown Geological Survey of Victoria, The Ballarat Gold-Fields