accession | architects | chronology | date | description | document type | drawer | drawing number | notes | plan type | project | size | source | title |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
M1 | HBO+EMTB | Drawing No: A04 | 28/07/2009 | Reflected Ceiling Plan - Humffray Room First Level and Ground Floor | document | 3 | A04 | preliminary | stage 1 | Full plan | Floor Plan - Humffray Room Reflected Ceiling Plan - Ground and First Floor | ||
M2 | HBO+EMTB | A01 | 28/07/2009 | Ground Level Demolition Plan | plan original | 3 | A01 | Related copies M46 & 67. | working | stage 1 | Full plan | Site Plan. Demolition Plan - Ground Level | |
M3 | HBO+EMTB | A02 | 28/07/2009 | Demolition Plans First and Second Levels | plan original | 3 | A02 | Endorsed Document Heritage Victoria Permit No: P14869. Related documents M47 Working Plan & M68 City of Ballarat Approved Plan : 27/10/09, BS-1364. |
working | stage 1 | Full plan | Demolition Plans First and Second Levels | |
M4 | HBO+EMTB | A03 | 28/07/2009 | New Works - Ground and First Levels | plan original | 3 | A03 | Endorsed Document Heritage Victoria Permit No: P14869 . M65 is Preliminary Drawings dated: 11th July 2009, 2nd & 15th July 2009. |
working | stage 1 | Full plan | New Works - Ground and First Levels | |
M5 | HBO+EMTB | AO4 | 28/07/2009 | Second Floor Plan - New Works. Roof Plan above OME Room. Ceiling Plan - OME Room. Ground Level Reflected Ceiling Plan | plan original | 3 | A04 | Endorsed Document Heritage Victoria Permit No: P14869. |
working | stage 1 | Full plan | Second Floor Plan - New Works. Roof Plan above OME Room. Ceiling Plan - OME Room. Ground Level Reflected Ceiling Plan |
|
M6 | HBO+EMTB | A05 | 28/07/2009 | First Level Reflected Ceiling Plan. Building Sections | plan original | 3 | A05 | Endorsed Document Heritage Victoria Permit No: P14869 M49 & M70 are copies of this record. |
working | stage 1 | Full plan | First Level Reflected Ceiling Plan. Building Sections | |
M7 | HBO+EMTB | A06 | 28/07/2009 | Building Sections. Construction Details | plan original | 3 | A06 | Endorsed Document Heritage Victoria Permit No: P14869 M50 & M71 are copies of this record. |
working | stage 1 | Full plan | Building Sections. Construction Details | |
M8 | HBO+EMTB | A07 | 28/07/2009 | Construction Details Sheet 1 Detail: Roof; Stair & Balustrade. |
plan original | 3 | A07 | 'Detail-Roof' is a mirror image of the drawing on Plan M51, related copy - M72. | working | stage 1 | Full plan | Construction Details Sheet 1 | |
M9 | HBO+EMTB | A08 | 28/07/2009 | Construction Details Sheet 2 Details: Step Ramp: Stair; Door Jamb; Spiral Stair (Ground Floor & First Floor); and Batten Room Doors. |
plan original | 3 | A08 | M51 is a copy of this drawing with alterations to 'Detail-Stair'. | working | stage 1 | A1 | Construction Details - Sheet 2 | |
M10 | HBO+EMTB | A09 | 28/07/2009 | Door Schedule - Joinery Details | Document Approved | 3 | A09 | City of Ballarat approved - 27 October 2009. BS - 1364. This is an approved copy of M66. |
approved | stage 1 | Full plan | Door Schedule - Joinery Details | |
M11 | HBO+EMTB | A10 | Proposed Back Stage & Store. Exisitng Conditions - Floor Plans. Ground Level - Existing; Auditorium - Existing. |
plan original | 3 | ATP001 | working | stage 1 | Full plan | Proposed Back Stage & Store. Existing Conditions - Floor Plans |
|||
M12 | HBO+EMTB | A11 | 28/07/2009 | Works Stage "2" Plans Ground & First Level |
plan original | 3 | A11 | City of Ballarat Approved 27 October 2009. BS - 1364. |
working | stage 1 | A1 | Works Stage '2' Plans | |
M13 | Cosgriff & Assoc. P/L | H-1 | 1/06/2009 | Hydraulic Services Sewer Layout - Ground and First Floor Existing Conditions | plan original | 3 | H-1 | working | stage 1 | Full plan | Hydraulic Services Sewer Layout - Ground and First Floor - Existing Conditions | ||
M14 | Cosgriff & Assoc. P/L | E-1 | 1/6/2009 | Electrical Services - Ground and First Floor Layout Existing Conditions | plan original | 3 | E-1 | working | stage 1 | Full plan | Electrical Services Ground and First Floor Layout - Existing Conditions | ||
M15 | Cosgriff & Assoc. P/L | E-2 | 1/6/2009 | Electrical Services - Second Floor Layout, Existing Conditions | plan original | 3 | E-2 | Endorsed Document P14869. 1 October 2009. HO987. Related copy |
working | stage 1 | Full plan | Electrical Services - Second Floor Layout, Existing Conditions | |
M16 | Cosgriff & Assoc. P/L | E-3 | 1/6/2009 | Electrical Services - Ground and First Floor Layout - Lighting Layout | plan original | 3 | E-3 | M62 is a site copy of this original plan. | working | stage 1 | Full plan | Electrical Services - Ground and First Floor Layout - Lighting Layout | |
M17 | Cosgriff & Assoc. P/L | E-4 | 1/06/2009 | Electrical Services - Ground and First Floor Layout - Power and Communications Layout | plan original | 3 | E-4 | City of Ballarat Approved 27 October 2009. BS-1364. This is a second copy of M63. |
working | stage 1 | Full plan | Electrical Services - Ground and First Floor Layout - Power and Communications Layout | |
M18 | Cosgriff & Assoc. P/L | M-1 | 1/6/2009 | Mechanical Services - Ground Floor Layout Includes: Mechanical Services Legend and Equipment Schematic Legend |
plan original | 3 | M-1 | Endorsed Document P14869. 1 October 2009. HO987. |
working | stage 1 | Full plan | Mechanical Services - Ground Floor Layout | |
M19 | HBO+EMTB | SE1 | 1/7/2009 | Ground Floor Plan and Notes Notes include: General, Concrete, Reinforcing, Structural Timber and Masonry |
plan original | 3 | SE1 | working | stage 1 | Full plan | Ground Floor Plan and Notes | ||
M20 | HBO+EMTB | SE2 | 1/7/2009 | First and Second Floor Plans | plan original | 3 | 0945 SE2 | Endorsed copy P14869. HO987. Related copies M75 & M91. |
working | stage 1 | Full plan | First and Second Floor Plans | |
M21 | Morton Dunn | WDA01 | 1/11/2006 | Demolition Ground & First Floor Plan Endorsed Document P11348 - 18 January 2007. |
plan original | 3 | WDA01 | Related copy M218 | approved | stage 1 | Full plan | Demolition Ground & First Floor Plans | |
M22 | Morton Dunn | WDA02 | 1/11/2006 | Demolition Second & Third Floor Plans Endorsed Document P11348. |
plan original | 3 | WDA02 | approved | stage 1 | Full plan | Demolition Second & Third Floor Plans | ||
M23 | Morton Dunn | WDA03 | 1/11/2006 | Demolition - Sections a - Cutaway View. - Section b & c - Cutaway Highlighting Stairwell. Demolition Detail a - Stairs. Endorsed Document P 11348 18/1/2007 |
plan original | 3 | WDA 03 | approved | stage 1 | Full plan | Demolition Sections | ||
M24 | Morton Dunn | WDA 04 | 1/11/2006 | Proposed Ground and First Floor Plans Endorsed Document P11348, 18/1/2007 |
plan original | 3 | WDA 04 | Related copy M217. | approved | stage 1 | Full plan | Proposed Ground and First Floor Plans | |
M25 | Morton Dunn | WDA 05 | 1/11/2006 | Proposed Second and Third Floor Plans Endorsed Document - P11348, 18/1/2007 |
plan original | 3 | WDA 05 | approved | stage 1 | Full plan | Proposed Second and Third floor Plans | ||
M26 | Morton Dunn | WDA 06 | 1/11/2006 | Reflected Ceiling Plans - ground, first and third floor Endorsed Document - P11348, 18/1/2007 |
plan original | 3 | WDA 06 | approved | stage 1 | Full plan | Reflected Ceiling Plans |
||
M27 | Morton Dunn | WDA 07 | 1/11/2006 | Elevations - North ( external) , West (external) and South Sections - elevation cutaway, north elevation tea room |
plan original | 3 | WDA 07 | This is a related copy of M210. | working | stage 1 | Full plan | Elevations and Sections | |
M28 | Morton Dunn | WDA 08 | 1/11/2006 | Section C - internal stairway cutaway Section D - internal stairway with new landing Section E - internal cutaway Roof Plan Endorsed Document P11348, 18/1 2007 |
plan original | 3 | WDA 08 | approved | stage 1 | Full plan | Sections and Roof Plan | ||
M29 | Morton Dunn | WDA 09 | 1/11/2006 | Internal Elevations - North stairs, South stairs Endorsed Document P11348, 18/1/2007 |
plan original | 3 | WDA 09 | approved | stage 1 | Full plan | Internal Elevations 1 | ||
M30 | Morton Dunn | WDA 10 | 1/11/2006 | Internal Elevations - west stairs, level 1, lift foyers levels 0-3 Stair Plans ground floor, first floor, second floor, third floor. Endorsed Document P11348 18/1/07 |
plan original | 3 | WDA 10 | approved | stage 1 | Full plan | Internal Elevations 2 & Stair Plans | ||
M31 | Morton Dunn | WDA 11 | 1/11/2006 | Internal Elevations 3 - Tea Room - Staff WC - Lift Foyer Ground Floor Endorsed Document P11348 18/1/07 |
plan original | 3 | WDA 11 | approved | stage 1 | Full plan | Internal Elevations 3 | ||
M32 | Morton Dunn | WDA 12 | 28/11/2006 | Internal Elevations 4 & Details - Sutton Room Endorsed Document P11348 18/1/07 |
plan original | 3 | WDA 12 | approved | stage 1 | Full plan | Internal Elevations 4 & Details | ||
M33 | MacLeod Consulting | S01 | 1/08/2006 | Face Sheet and Standard Notes Endorsed Document P11348 18/1/07 |
plan original | 3 | S01 | approved | stage 1 | Full plan | Face Sheet and Standard Notes | ||
M34 | MacLeod Consulting | S02 | 1/08/2006 | Ground and First Floor Level Works Endorsed Document P11348 18/1/07 |
plan original | 3 | S02 | Related copy M214. | approved | stage 1 | Full plan | Ground and First Floor Level Works | |
M35 | MacLeod Consulting | S03 | 1/08/2006 | Second and Third Floor Level Works Endorsed Document P11348 18/1/07 |
plan original | 3 | S03 | approved | stage 1 | Full plan | Second and Third Floor Level Works | ||
M36 | MacLeod Consulting | S04 | 1/08/2006 | Building Sections |
plan original | 3 | S04 | Endorsed Document P11348 18/1/07. Related copy M216. |
working | stage 1 | Full plan | Building Sections | |
M37 | MacLeod Consulting | S05 | 1/08/2006 | Typical Details Stair Sections and Pump Notes Endorsed Document P11348 18/1/07 |
plan original | 3 | S05 | approved | stage 1 | Full plan | Typical Details | ||
M38 | Cosgriff & Assoc. P/L | M-1 | 1/11/2006 | Mechanical Services Ventilation Layout Ground, First, Second, Third Floors - Part Floor Plans Includes Mechanical Services Legend Endorsed Document P11348 18/1/07 |
plan original | 3 | M-1 | approved | stage 1 | Full plan | Mechanical Services Ventilation Layout | ||
M39 | Cosgriff & Assoc. P/L | 1/11/2006 | Electrical Services - Lighting, Power & Fire Detection Layouts Ground Floor and First Floor. Includes Lighting Legend Endorsed Document P11348 18/1/07 |
plan original | 3 | E-1 | approved | stage 1 | Full plan | Electrical Services - Lighting, Power & Fire Detection Layouts Ground Floor and First Floor |
|||
M40 | Cosgriff & Assoc. P/L | E-2 | 1/11/2006 | Electrical Services. Lighting, Power & Fire Detection Layouts Second Floor, Third Floor and Basement. Basement Part Floor Plan. Stairway North Elevation Endorsed Document P11348 18/1/07 |
plan original | 3 | E-2 | approved | stage 1 | A1 | Electrical Services. Lighting, Power & Fire Detection Layouts Second Floor, Third Floor and Basement | ||
M41 | Cosgriff & Assoc. P/L | E-3 | 1/11/2006 | Electrical Services Schematic Diagrams Electrical Single Line Diagram Endorsed Document P11348 18/1/07 |
plan original | 3 | E-3 | approved | stage 1 | Full plan | Electrical Services Schematic Diagrams | ||
M42 | Cosgriff & Assoc. P/L | H-1 | 1/11/2006 | Hydraulic Services Sewer Layout Ground, First, Second & Third Floor Part Floor Plans Includes Sewer Legend Endorsed Document P11348 18/1/07 |
plan original | 3 | H-1 | approved | stage 1 | Full plan | Hydraulic Services Sewer Layout | ||
M43 | Cosgriff & Assoc. P/L | H-2 | 1/11/2006 | Hydraulic Services Cold Water, Domestic Hot Water. & Hose Reel Layouts - Meter Detail - Domestic Hot Water Piping Schematic - Basement and First Floor Part Floor Plans Domestic Hot Water and Cold Water Notes Endorsed Document P11348 18/1/07 |
plan original | 3 | H-2 | approved | stage 1 | Full plan | Hydraulic Services C.W., D.H.W. & Hose Reel Layouts | ||
M44 | Cosgriff & Assoc. P/L | H-3 | 1/11/2006 | Hydraulic Services Cold Water, Domestic .Hot. Water & Hose Reel Layouts First and Second Floor Part Floor Plans Endorsed Document P11348 18/1/07 |
plan original | 3 | H-3 | approved | stage 1 | Full plan | Hydraulic Services C.W., D.H.W. & Hose Reel Layouts | ||
M45 | Cosgriff & Assoc. P/L | H-4 | 1/11/2006 | Hydraulic Services Cold Water, Domestic .Hot Water. Tempered Warm Water & Fire Hose Reel Schematics Endorsed Document P11348 18/1/07 |
plan original | 3 | H-4 | approved | stage 1 | Full plan | Hydraulic Services C.W., D.H.W. Tempered Warm Water & Fire Hose Reel Schematics |
||
M46 | HBO+EMTB | A01 | 28/07/2009 | Site Plan with alterations. Demolition Plan - Ground Level |
Site Copy | 3 | A01 | There are two related copies M2 & M67. | working | stage 1 | Full plan | Site Plan Demolition Plan - Ground Level |
|
M47 | HBO+EMTB | A02 | 28/07/2009 | Demolition Plans - First and Second Floors Site Copy with alterations |
Site Copy | 3 | A02 | Copy of Endorsed original plan (M3). M68 is a City of Ballarat Approved copy. 27/10/2009. BS 1364. |
working | stage 1 | Full plan | Demolition Plans First and Second Levels |
|
M48 | HBO+EMTB | A04 | 28/07/2009 | Second Floor Plan - New Works Roof Plan above OME Room Ceiling Plan - OME Room Ground Level Reflected Ceiling Plan Site Copy with alterations |
Site Copy | 3 | A04 | working | stage 1 | Full plan | Second Floor Plan - New Works Roof Plan above OME Room Ceiling Plan - OME Room Ground Level Reflected Ceiling Plan |
||
M49 | HBO+EMTB | A05 | 28/07/2009 | First Level Reflected Ceiling Plan Building Sections Site Copy with alterations |
Site Copy | 3 | A05 | This is a Site Copy of M6 & M70. | working | stage 1 | Full plan | First Level Reflected Ceiling Plan Building Sections Building Sections |
|
M50 | HBO+EMTB | A06 | 28/07/2009 | Building Sections Construction Details Site Copy with alterations |
Site Copy | 3 | A06 | This is a site copy of M7 & M71. | working | stage 1 | Full plan | Building Sections Constructions Details |
|
M51 | HBO+EMTB | A07 | 28/07/2009 | Construction Details - Sheet 1 Copy with alterations |
Site Copy | 3 | A07 | Endorsed Document P14869. 1 October 2009. .Detail-Roof' on this drawing is a mirror image of drawing on Plan M8. Related record - M72. |
working | stage 1 | Full plan | Construction Details - Sheet 1 | |
M52 | HBO+EMTB | 28/07/2009 | Construction Details - Sheet 2 includes: step ramp; details stair; detail GD09; detail door jamb; section-step ramp; detail stair; plan/step ramp; spiral stair ground floor plan; spiral stair first floor plan; detail-doors to Batten Room. Copy with Alterations |
Site Copy | 3 | A08 | 'Detail Stair' on this drawing shows inclusion of: 'Concrete footing and brick dwarf wall to engineers detail' Related copies M9 & M73. |
working | stage 1 | Full plan | Construction Details - Sheet 2 | ||
M53 | HBO+EMTB | 11/06/2009 | Demolition Plans First and Second Floors |
plan original | 3 | A02 | preliminary | stage 1 | Full plan | Demolition Plans First and Second Floors | |||
M54 | HBO+EMTB | 28/07/2009 | Works Stage "1" Plans Ground level; First level; OME Roof Copy of original |
Site Copy | 3 | A10 | Site copy of original Related copies - M74 & M89. |
working | stage 1 | Full plan | Works Stage '1' Plans | ||
M55 | HBO+EMTB | 28/07/2009 | Works Stage '2' Plans Plan-Ground Level; Plan-First Level |
Site Copy | 3 | A11 | Endorsed Document P14869. 1 October 2009. HO987. |
working | stage 1 | Full plan | Works Stage '2' Plans | ||
M56 | HBO+EMTB | 29/07/2009 | Ground Floor Plan and Notes | Site Copy | 3 | 0945 SE1 | Endorsed Document P14869. 1 October 2009. HO987. |
working | stage 1 | Full plan | Ground Floor Plan and Notes | ||
M57 | HBO+EMTB | 28/07/2009 | First & Second Floor Plans First Floor Plan includes Revison A |
Site Copy | 3 | 0945 SE2 | Site copy of original - includes Revision A. | working | stage 1 | Full plan | First & Second Floor Plans | ||
M58 | HBO+EMTB | 28/07/2009 | Member Schedule & Structural Details |
Site Copy | 3 | 0945 SE3 | Endorsed Document P14869. 1 October 2009. HO987. |
working | stage 1 | Full plan | Member Schedule & Structural Details | ||
M59 | HBO+EMTB | 28/07/2009 | Structural Details | Site Copy | 3 | 0945 SE4 | Endorsed Document P14869. 1 October 2009. HO987. |
working | stage 1 | Full plan | Structural Details | ||
M60 | Cosgriff & Assoc. P/L | E-1 | 1/06/2009 | Ground & First Floor Layout Existing Conditions, Demolition and Relocation Work | Site Copy | 3 | E-1 | working | stage 1 | Full plan | Ground & First Floor Layout Existing Conditions, Demolition and Relocation Work | ||
M61 | Cosgriff & Assoc. P/L | E-2 | 1/06/2009 | Electrical Services Second Floor Layout - Existing Conditions |
Site Copy | 3 | E-2 | City of Ballarat Approved - 27 October 2009. BS1364. Second copy of M15. |
approved | stage 1 | Full plan | Electrical Services Second Floor Layout - Existing Conditions |
|
M62 | Cosgriff & Assoc. P/L | E-3 | 1/06/2009 | Electrical Services Ground and First Floor Layout Lighting and Fire Detection Layout |
Site Copy | 3 | E-3 | Endorsed Document P14869. 1 October 2009. HO987. Related copy M80. |
working | stage 1 | Full plan | Electrical Services Ground and First Floor Layout Lighting and Fire Detection Layout |
|
M63 | Cosgriff & Assoc. P/L | E-4 | 1/06/2009 | Electrical Services - Ground and First Floor Layout - Power and Communications | Site Copy | 3 | E-4 | This is a site copy of the original M17 with alterations. | working | stage 1 | Full plan | Electrical Services - Ground and First Floor Layout - Power and Communications | |
M64 | Cosgriff & Assoc. P/L | H-1 | 1/06/2009 | Hydraulic Services - Ground and First Floor Proposed Layout | plan original | 3 | H-1 | Endorsed Document P14869 1 October 2009 Related Record M81. |
working | stage 1 | Full plan | Hydraulic Services - Ground and First Floor Proposed Layout | |
M65 | HBO+EMTB | 11/06/2009 | New Works - Ground & First Floor Plans | document | 3 | A03 | City of Ballarat Approved 27 October 2009 BS-1364. |
preliminary | Full plan | New Works - Ground & First Floor Plans | |||
M66 | HBO+EMTB | 28/07/2009 | Door Schedule - Joinery Details | Document Approved | 3 | A09 | City of Ballarat Approved - 27 October 2009. BS-1364. Damaged copy - torn top left hand corner. |
approved | stage 1 | Full plan | Door Schedule - Joinery Details | ||
M67 | HBO+EMTB | 28/07/2009 | Site Plan Demolition Plan - Ground Level | Document Approved | 3 | A01 | City of Ballarat Approved 27 October 2009 BS-1364. Related copies M2 & M46. |
approved | stage 1 | Full plan | Site Plan Demolition Plan - Ground Level | ||
M68 | HBO+EMTB | 28/07/2009 | Demolition Plans First and Second Levels | Document Approved | 3 | A02 | City of Ballarat Approved copy of M3 & M47. 27/10/09 BS-1364. |
approved | stage 1 | Full plan | Demolition Plans First and Second Levels | ||
M69 | HBO+EMTB | 28/07/2009 | Second Floor Plan - New Works Roof Plan above OME Room Ceiling Plan - OME Room Ground Level Reflected Ceiling Plan |
Document Approved | 3 | A04 | Approved copy of M5 & M48. City of Ballarat Approved 27/10/09. BS-1364. |
approved | stage 1 | Full plan | Second Floor Plan - New Works Roof Plan above OME Room Ceiling Plan - OME Room Ground Level Reflected Ceiling Plan |
||
M70 | HBO+EMTB | 28/07/2009 | First Level Reflected Ceiling Plan Building Sections |
Document Approved | 3 | A05 | City of Ballarat Approved copy of M6 & M49. 27/10/09 BS-1364. |
approved | stage 1 | Full plan | First Level Reflected Ceiling Plan Building Sections |
||
M71 | HBO+EMTB | 28/07/2009 | Building Sections Construction Details | Document Approved | 3 | A06 | City of Ballarat Approved copy of M7 & M50. 27/10/09 BS-1364. |
approved | stage 1 | Full plan | Building Sections Construction Details |
||
M72 | HBO+EMTB | 28/07/2009 | Construction Details - Sheet 1 | Document Approved | 3 | A07 | City of Ballarat Approved copy of M8 and M51. 27/10/09 BS-1364. Related records - M8 & M51. |
approved | stage 1 | Full plan | Construction Details - Sheet 1 | ||
M73 | HBO+EMTB | 28/07/2009 | Construction Details - Sheet 2 | Document Approved | 3 | A08 | City of Ballarat Approved copy of M51. 27/10/09 BS-1364. Related copy M9. |
approved | stage 1 | Full plan | Construction Details - Sheet 2 | ||
M74 | HBO+EMTB | 28/07/2009 | Works Stage "1" Plans | Document Approved | 3 | A10 | City of Ballarat Approved 27 October 2009. BS-1364. This is an Approved copy of Site Copy M54. Related copy M89 ( Preliminary). |
approved | stage 1 | Full plan | Works Stage "1" Plans | ||
M75 | HBO+EMTB | 28/07/2009 | First and Second Floor Plans | Document Approved | 3 | 0945 SE2 | .City of Ballarat Approved 27 October 2009. BS-1364. Related copies M20 & M91. |
approved | stage 1 | Full plan | First and Second Floor Plans | ||
M76 | HBO+EMTB | 01/07/2009 | Member Schedule & Structural Details | Document Approved | 3 | 0945 SE3 | City of Ballarat Approved 27 October 2009. BS-1364. This is a second copy of M58. |
approved | stage 1 | Full plan | Member Schedule & Structural Details | ||
M77 | HBO+EMTB | 01/07/2009 | Structural Details | Document Approved | 3 | 0945 SE4 | City of Ballarat Approved 27 October 2009. BS-1364. |
approved | stage 1 | Full plan | Structural Details | ||
M78 | Cosgriff & Assoc. P/L | 01/07/2009 | Mechanical Services - Ground Floor Layout | Document Approved | 3 | M-1 | City of Ballarat Approved 27 October 2009. BS-1364. This is a second copy of M18. |
approved | stage 1 | Full plan | Mechanical Services - Ground Floor Layout | ||
M79 | Cosgriff & Assoc. P/L | 01/06/2009 | Electrical Services - Ground and First Floor Layout Existing Conditions, Demolition and Relocation Work. | Document Approved | 3 | E-1 | City of Ballarat Approved 27 October 2009. BS1364. Related copy M83. |
approved | stage 1 | Full plan | Electrical Services - Ground and First Floor Layout Existing Conditions, Demolition and Relocation Work. |
||
M80 | Cosgriff & Assoc. P/L | 01/06/2009 | Electrical Services - Ground and First Floor Layout Lighting and Fire Detection Layout. |
Document Approved | 3 | E-3 | City of Ballarat Approved 27 October 2009. BS1364. Related copy M62. |
approved | stage 1 | Full plan | Electrical Services Ground and First Floor Layout Lighting and Fire Detection Layout. |
||
M81 | Cosgriff & Assoc. P/L | 01/06/2009 | Hydraulic Services - Ground and First Floor Proposed Layout. | Document Approved | 3 | H-1 | City of Ballarat Approved - 27 October 2009. BS-1364. Related record M64 - Endorsed. |
approved | stage 1 | Full plan | Hydraulic Services Ground and First Floor Proposed Layout |
||
M82 | HBO+EMTB | 28/07/2009 | Door Schedule Joinery Details | plan original | 3 | A09 | Endorsed Document P14869. 1 October 2009. HO987. |
working | stage 1 | Full plan | Door Schedule Joinery Details | ||
M83 | Cosgriff & Assoc. P/L | 01/06/2009 | Electrical Services Ground and First Floor Layout Existing Conditions, Demolition and Relocation Work. | plan original | 3 | E-1 | Endorsed Document P14869. 1 October 2009. HO987. Related copy M79. |
working | stage 1 | Full plan | Electrical Services Ground and First Floor Layout Existing Conditions, Demolition and Relocation Work. |
||
M84 | HBO+EMTB | 11/06/2009 | First Floor Reflected Ceiling Plan - Building Sections - Building Sections Reflected Ceiling Plan First Floor; Section OME Batten Room; Proposed Ladder and Balustrade; Detail - Ladder; Detail - Rainwaterhead; Detail - East Light Court; Details Section. |
plan original | 3 | A05 | preliminary | stage 1 | Full plan | First Floor Reflected Ceiling Plan - Building Sections - Building Sections |
|||
M85 | HBO+EMTB | 15/07/2009 | Construction Details Detail - Roof; Detail - Door Jamb; New Curved Wall - Plan; Detail - Balustrade/Stair; Section Through Curved Wall. |
plan original | 3 | A07 | preliminary | stage 1 | Full plan | Construction Details | |||
M86 | HBO+EMTB | 11/06/2009 | Construction Details Plan - Step Ramp; Section - Step Ramp; Section Through Step Ramp; Detail - Stair; Detail - GD09; Detail - Door Jamb; Detail - Doors to Batten Room; Spiral Stair - Ground and First Floor. |
plan original | 3 | A08 | preliminary | stage 1 | Full plan | Construction Details | |||
M87 | HBO+EMTB | 2/07/2009 | Door Schedule Joinery Details Door Jamb - GO1 & GO2; Door Jamb - GD14; Library Circulation Area - Joinery; Library Circulation Area. |
plan original | 3 | A09 | Related Plans M10, M66 & M82. Pencil note "Repair existing gates - fit new hardware". |
preliminary | stage 1 | Full plan | Door Schedule Joinery Details | ||
M88 | HBO+EMTB | 01/07/2009 | Structural Details Includes Legend 1 -14 Structural Steel. |
plan original | 3 | 0945 SE4 | City of Ballarat Approved 27 October 2009. BS-1364. Related copies M59 & M77. |
working | stage 1 | Full plan | Structural Details | ||
M89 | HBO+EMTB | 15/7/2009 | Works Stage "1" Plans | plan original | 3 | A10 | Related copies M54 & M74. | preliminary | stage 1 | Full plan | Works Stage "1" Plans | ||
M90 | HBO+EMTB | 01/07/2009 | Ground Floor Plan & Notes | plan original | 3 | 0945 SE1 |
Related copy M56. | approved | stage 1 | Full plan | Ground Floor Plan & Notes | ||
M91 | HBO+EMTB | 01/07/2009 | First and Second Floor Plans | plan original | 3 | 0945 SE2. | Related copies M20 & M75. | approved | stage 1 | Full plan | First and Second Floor Plans | ||
M92 | HBO+EMTB | Schematic Design Proposed Back Stage & Store Plans Ground Level Proposed & Auditorium Proposed. |
plan original | 3 | TP002 | working | stage 1 | Full plan | Schematic Design Proposed Back Stage & Store Plans |
||||
M93 | HBO+EMTB | Proposed Back Stage & Store Existing Conditions Floor Plans Ground Level Existing Auditorium Existing |
plan original | 3 | TP001 | Related copy M94 | preliminary | stage 1 | Full plan | Proposed Back Stage & Store Existing Conditions Floor Plans |
|||
M94 | HBO+EMTB | Proposed Back Stage & Store Existing Conditions Floor Plans Ground Level Existing Auditorium Existing |
plan original | 3 | TP001 | Related record M93 - Preliminary | working | stage 1 | Full plan | Proposed Back Stage & Store Existing Conditions Floor Plans |
|||
M95 | HBO+EMTB | Proposed Back Stage & Store Elevations & Sections South Elevation - Existing Conditions South Elevation - Proposed Back Stage Store Section - Back Stage Store Section - Walkway/Link. |
plan original | 3 | TP003 | working | stage 1 | Full plan | Proposed Back Stage & Store Elevations & Sections |
||||
M96 | 11/12/2009 | Mezzanine Floor | plan original | 3 | 10-001-SJW_BMI_OME | Includes "Item" Legend. | working | stage 1 | Full plan | Mezzanine Floor | |||
M97 | HBO+EMTB | 11/06/2009 | New Works Ground & First Floor Plans | plan original | 3 | A03 | working | stage 1 | Full plan | New Works Ground & First Floor Plans | |||
M98 | HBO+EMTB | Reflected Ceiling Plan - Ground & First Floor Building Elevation 3 Ome Ceiling Reflected Ceiling Plan - OME Mezzanine Building Section |
plan original | 3 | A05 | preliminary | stage 1 | Full plan | Reflected Ceiling Plan - Ground & First Floor Building Elevation 3 | ||||
M99 | HBO+EMTB | Site Plan & Ground Level Demolition Plans Plan - Site Plan Plan - Ground Level Demolition Legend |
plan original | 3 | A01 | preliminary | stage 1 | Full plan | Site Plan & Ground Level Demolition Plans | ||||
M100 | HBO+EMTB | Demolition First & Second Floor | plan original | 3 | A01 | preliminary | stage 1 | Full plan | Demolition First & Second Floor | ||||
M101 | HBO+EMTB | Site Plan & Ground Level Demolition Plan Demolition Legend included. General Notes included. |
plan original | 3 | A01 | preliminary | stage 1 | Full plan | Site Plan & Ground Level Demolition Plan | ||||
M102 | HBO+EMTB | Details & Sections New Ramp Detail |
plan original | 3 | A06 | preliminary | stage 1 | Full plan | Details & Sections | ||||
M103 | HBO+EMTB | Building Section RFL - First Floor Roof Detail Reflected Ceilng Plan - First Floor Roof Detail Building Section |
plan original | 3 | A05 | preliminary | stage 1 | Full plan | Building Section RFL - First Floor Roof Detail | ||||
M104 | HBO+EMTB | Reflected Ceiling Plan - Ground & OME Mezzanine & Roof Plan |
plan original | 3 | A04 | preliminary | stage 1 | Full plan | Reflected Ceiling Plan - Ground & OME Mezzanine & Roof Plan | ||||
M105 | HBO+EMTB | 11/06/2009 | New Works Second Floor Plan Ground Floor Reflected Ceiling Plan | plan original | 3 | A04 | preliminary | stage 1 | Full plan | New Works Second Floor Plan Ground Floor Reflected Ceiling Plan |
|||
M106 | HBO+EMTB | Demolition, First Level Humffray Room Roof OME | plan original | 3 | A02 | preliminary | stage 1 | Full plan | Demolition, First Level Humffray Room Roof OME | ||||
M107 | HBO+EMTB | 11/06/2009 | Building Sections | plan original | 3 | A06 | Related record M36. | preliminary | stage 1 | Full plan | Building Sections | ||
M108 | HBO+EMTB | 11/06/2009 | Demolition Plans First and Second Floors | plan original | 3 | A02 | Related record M53. | preliminary | stage 1 | Full plan | Demolition Plans First and Second Floors | ||
M109 | HBO+EMTB | 11/06/2009 | Section Details 1 | plan original | 3 | A07 | preliminary | stage 1 | Full plan | Section Details 1 | |||
M110 | HBO+EMTB | 11/06/2009 | Details Details - Stair: New Curved Wall - Plan; Section Through New Curved Wall; New Gate Details. |
plan original | 3 | A08 | preliminary | stage 1 | Full plan | Details | |||
M111 | HBO+EMTB | 11/06/2009 | OME Roof Plan Reflected Ceiling Plan Auditorium Reflected Ceiling Plan Reflected Ceiling Plan - First Floor Reflected Ceiling Plan OME Room Section - OME Detail - Roof Rainwaterhead Detail Section - OME & Batten Room |
plan original | 3 | A05 | preliminary | stage 1 | Full plan | OME Roof Plan Reflected Ceiling Plan Auditorium Reflected Ceiling Plan | |||
M112 | HBO+EMTB | Demolition Plan - Third Floor New Works Plan - Ground Floor |
plan original | 3 | A02 | NOTE: NO TITLE FOR THIS DRAWING. | preliminary | stage 1 | Full plan | Demolition Plan | |||
M113 | 16/11/2009 | The Works Program - Mechanics Institute Stage 2 | plan original | 3 | preliminary | stage 2 | Full plan | The Works Program - Mechanics Institute Stage 2 | |||||
M114 | 01/01/2005 | Central Highlands Water - Facilities Mapping System NOTE: Details of sewage easement rear of BMI and Unicorn. |
plan original | 3 | NOTE: Contains details of sewage easement rear of BMI and Unicorn. | sewage | A4 | Central Highlands Water - Facilities Mapping System | |||||
M115 | 15/09/1999 | Plan of Drainage - The Ballaarat Mechanics Institute Nos. 113-121 Sturt Street (Agent: Messrs J.H. Brown & Son, 107 Doveton Street South) |
plan copy | 2 | Copy obtained from Central Highlands Water 15/9/99. | sewage | A3 | Ballarat Sewerage Authority - Master Plan - Sewerage Area No.3 |
|||||
M116 | 21/11/1957 | Plan of Drainage - No. 125 & rear of 123-125 The Ballarat Mechanics Institute. |
plan original | 2 | Sewage Line for highlighted shop belongs to the BMI. | sewage | stage 1 | Ballarat Sewerage Authority - Plan of Drainage | |||||
M117 | J.H. Jones | 28/05/1869 | Plans: Steps to Platform & Plan of Footway in Cutters. | plan original | 2 | Note on Plan reads "Plan referred to in agreement Dated June 9th 1869. Taylor & Ellis". (Contractors of Ballarat). | stage 1 | A3 | Mechanics Institute - Plans for Steps to Platform & Footway in Cutters. | ||||
M118 | J.H. Jones | 28/05/1869 | Plan - Platform and Staircase Section on A.B. |
plan original | 2 | Note on Plan - Plan referred to in agreement Dated June 9th 1869. Taylor & Ellis (Contractors of Ballarat). | stage 1 | Mechanics Institute - Platform and Staircase Section on A.B. |
|||||
M119 | J.H. Jones | 18/01/1869 | Mezzanine Floor. | plan original | 2 | stage 1 | A4 | Mechanics Institute - Mezzanine Floor. | |||||
M120 | J.H. Jones | 09/06/1869 | Mechanics Institute - Verandahs. | plan original | 2 | Plan referred to in agreement Dated 9th June 1869. Taylor & Ellis. (Contractors of Ballarat). | stage 1 | A3 | Mechanics Institute - Verandahs | ||||
M121 | J.H. Jones | 28/05/1869 | Mechanics Institute - Staircase and Platform Side Elevation Platform Plan Plan of Stairs Front Elevation. |
plan original | 2 | Plan referred to in agreement Date the 9th June 1869. Taylor & Ellis (Contractors of Ballarat). | stage 1 | Full plan | Mechanics Institute - Staircase and Platform | ||||
M122 | J.H. Jones | Mechanics Institute - Staircase from Hall Level to Gallery & Museum. | plan original | 2 | A3 | Mechanics Institute - Staircase from Hall Level to Gallery & Museum. | |||||||
M123 | Mechanics Institute - plan showing separate Ladies & Gentlemens Retireing Rooms and Elevation. | plan original | 2 | stage 1 | A3 | Mechanics Institute - Retireing Rooms. | |||||||
M124 | J.H. Jones | 11/09/1868 | Girder Details Mechanics' Institute. Cast Iron Girders Gallery Girder |
plan original | 2 | One of the plans referred to in agreement dated September 26, 1868. Jonathon Coulson Contractor of Ballarat. | stage 1 | Girder Details Mechanics' Institute. | |||||
M125 | Plan of Basement, Ground Floor Plan & Front Elevation to correct Former Plan. | plan original | 2 | stage 1 | A3 | Mechanics Institute - Plan of Basement, Ground Plan & Front Elevation to correct Former Plan. | |||||||
M126 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | Proposed Building Conservation, and Development. Sturt Street Verandah to Facade. |
plan original | 2 | B133.1.7 | stage 1 | Proposed Building Conservation, and Development. | |||||
M127 | J.H. Jones | 18/11/1968 | Mechanics Institute of Ballarat - Platform in Hall. | plan original | 2 | Plan submitted but not carried out. | preliminary | stage 1 | Full plan | Mechanics Institute - Platform in Hall. | |||
M128 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | Proposed Building Conservation, and Development. Sturt Street Facade - Front Elevation. |
plan original | 4 | B133.1.7 | One of the plans referred to agreement dated September 26th, 1868. Jonathon Coulson. This is a larger version of M126 showing the full facade of the BMI. |
preliminary | stage 1 | Full plan | The Ballarat Mechanics Institute - Proposed Building Conservation, and Development. Sturt Street Facade - Front Elevation. |
||
M129 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | proposed Building Conservation, and Development. Ground Floor Plan. |
plan original | 4 | B133.1.2 | working | stage 1 | Full plan | Proposed Building Conservation, and Development - Ground Floor Plan. | |||
M130 | Coburn & Associates | 01/06/1964 | Proposed New Verandah. | plan original | 4 | working | stage 1 | Full plan | Mechanics Institute Sturt Street Ballarat Proposed New Verandah |
||||
M131 | Messrs Cowper Murphy & Assoc. | 01/06/1954 | Proposed Alterations to the Brittannia Theatre Sturt Street for Greater Union Theatres Pty. Ltd. | plan original | 4 | approved | stage 1 | Full plan | Proposed Alterations to the Brittannia Theatre Sturt Street Ballarat for Greater Union Theatres P/L. | ||||
M132 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | Proposed Building Conservation, and Development Ground Floor Plan |
plan original | 4 | B133.1.2 | working | stage 1 | A0 | Proposed Building Conservation, and Development Ground Floor Plan |
|||
M133 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | Proposed Building Conservation, and Development First Floor Plan |
plan original | 4 | B133.1.3 | working | stage 1 | Proposed Building Conservation, and Development First Floor Plan |
||||
M134 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | Proposed Building Conservation, and Development Second Floor Plan |
plan original | 4 | B133.1.4 | working | stage 1 | Proposed Building Conservation, and Development Second Floor Plan |
||||
M135 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | Proposed Building Conservation, and Development Third Floor Plan |
plan original | 4 | B133.1.5 | working | stage 1 | A1 | Proposed Building Conservation and Development Third Floor Plan |
|||
M136 | J.H. Jones | 01/11/1968 | Roof Plan | plan original | 4 | One of the Plans referred to in agreement dated September 26, 1868 - Jonathon Coulson. |
working | stage 1 | Ballarat Mechanics Institute Roof Plan |
||||
M137 | J.H. Jones | 28/05/1869 | Staircase and Platform Plan | plan copy | 4 | Plan referred to in agreement dated the 9th June 1869. Taylor & Ellis. | working | stage 1 | Staircase and Platform Plan | ||||
M138 | Staircase from Hall Level to Gallery & Museum. | plan copy | 4 | stage 1 | Staircase from Hall Level to Gallery & Museum. | ||||||||
M139 | Jack H. Greer | 26/01/1935 | SKETCH - Part of Crown Allotment 2, Section 13 City and Parish of Ballaarat County of Grenville. Ground Level sketch shows Unicorn Hotel, Bicycle Shop, Library Area and noting Shops 123-7. |
plan copy | 4 | Jack H. Greer Licensed Surveyor 26/1/35. Note: Inside measurement 49x 3.5 |
non-current | A3 | SKETCH - Part of Crown Allotment 2, Section 13 City and Parish of Ballaarat County of Grenville. |
||||
M140 | Plan of Basement - Ground Plan - Front Elevation. |
plan copy | 4 | Drawing makes note that the underground flues can be provided for the offices by carrying them down the walls into the basement. | stage 1 | A2 | Plan of Basement | ||||||
M141 | Clegg & Morrow | Proposed Show Window Sturt Street Plan shows Front Elevation and Entrance Door details. |
plan copy | 4 | Blueprint drawing. | non-current | A3 | Proposed Show Window Sturt Street | |||||
M142 | Gaylord Bros, Inc. | 03/01/1936 | Proposed Plan 1 & 2 of Library Library Plans - Old Mining Exchange |
plan original | 4 | 1 | Plan is signed by John G. Matthews. | non-current | Proposed Plan 1 & 2 of Library Library Plans - Old Mining Exchange |
||||
M143 | 11/11/1937 | Ground Floor and Mezzanine Floor Drawings | plan copy | 4 | Stamp on drawing states CHW accepts no responsibility for any inaccuracies on the plan. Drawing contains a lot of hand-written detail. |
non-current | stage 1 | A3 | Ground Floor and Mezzanine Floor Drawings. | ||||
M144 | Coburn & Associates | 01/06/1964 | Proposed New Verandah Plan shows detail B.2. to C.I.R.C.2 Detail 1, 2 & 3. North Elevation and Plan of Vernadah Lining. |
plan copy | 4 | stage 1 | Full plan | Proposed New Verandah | |||||
M145 | Detail Balcony Floor of Library & Balcony, Half Section & Elevation. |
plan copy | 4 | stage 1 | Full plan | Detail Balcony Mechanics Institute | |||||||
M146 | J.H. Jones | 11/09/1868 | Mechanics Institute Gallery Plan No. 5. | plan copy | 4 | Handwritten note signed by Jonathon Coulson "one of the plans referred to in agreement dated September 26th, 1868". | non-current | Non-Standard | Mechanics Institute Gallery Plan No. 5. | ||||
M147 | J.H. Jones | 11/09/1868 | Girder Details Mechanics Institute Cast Iron Girders. |
plan copy | 4 | Handwritten Note signed by Jonathon Coulson "one of the plans referred to in agreement dated September 26th 1868. | non-current | Non-Standard | Mechanics Institute Girder Details | ||||
M148 | J.H. Jones | 03/03/1869 | Mechanics Institute Detail of Roof | plan copy | 4 | Handwritten Note says Memo Tracing given to Thomas & Cook - March 4th, 1869. | non-current | Non-Standard | Mechanics Institute Detail of Roof | ||||
M149 | J.H. Jones | 07/09/1869 | Mechanics Institute - Brass Guard-Bars One for each Front |
plan copy | 4 | non-current | Non-Standard | Mechanics Institute - Brass Guard-Bars One for each Front |
|||||
M150 | J.H. Jones | 11/09/1868 | Mechanics Institute Roof Plan No. 7. | plan copy | 4 | Handwritten Note - "One of the plans referred to in agreement dated September 26, 1868". | non-current | Non-Standard | Mechanics Institute Roof Plan No. 7. | ||||
M151 | Clegg & Morrow | 01/06/1942 | Lavatory, Accommodation for the Ballarat Mechanics Institute, Sturt Street. | plan copy | 4 | non-current | A4 | Lavatory, Accommodation for the Ballarat Mechanics Institute, Sturt Street. | |||||
M152 | J.H. Jones | 28/05/1869 | Mechanics Institute Platform and Staircase Section on A.B. |
plan copy | 4 | Handwritten Note - Plan referred to in agreement dated June 9th, 1869. Taylor & Ellis. | non-current | Non-Standard | Mechanics Institute Platform and Staircase Section on A.B. |
||||
M153 | 21/11/1957 | Ballarat Sewerage Authority - Plan of Drainage. Detail Plan No 24. Drainage Plan No. 247. |
plan copy | 4 | Plan is stamped - Officer in Charge House Connections. 25 February 1958. | non-current | Non-Standard | Ballarat Sewerage Authority - Plan of Drainage. | |||||
M154 | Messrs Cowper Murphy & Assoc. | Proposed Alterations to Mechanics Institute - Schemes 2 and 3 Scheme 2: Longitudinal Section; Seating Plan; Circle Foyer Floor Plan; Ground Floor Plan Scheme 3: Longitudinal Section; Dress Circle Plan; Second Floor Plan; First Floor Plan; Ground Floor Plan |
plan original | 4 | Historic Note: Stairs to roof and observation tower with decorative lace work (external) shown on Longitudinal Section. | non-current | Non-Standard | Proposed Alterations to Mechanics Institute Ballarat - Schemes 2 and 3 | |||||
M155 | J.H. Jones | 28/05/1869 | Steps to Platform & Plan of Footway in Gutters. | plan copy | 4 | Handwritten note: Plan referred to in agreement dated June 9th 1869. Taylor & Ellis. |
non-current | Non-Standard | Mechanics Institute - Steps to Platform & Plan of Footway in Gutters | ||||
M156 | New Verandah: Mechanics Institute Sturt Street Ballarat. Plan features Perspective (Facade) & Floor Plan of Foyer, Office & Shops and new verandah over. |
plan copy | 4 | non-current | Full plan | New Verandah: Mechanics Institute Sturt Street Ballarat. | |||||||
M157 | Reinstatement of Mechanics Institute Hall | plan copy | 2 | Plan stamped Public Health Department No. 03630 17 July 1915. | non-current | stage 1 | Full plan | Reinstatement of Mechanics Institute Hall |
|||||
M158 | Detail Balcony - Mechanics Institute Detailing Floor of Library and Floor of Balcony. Half Plan & Half Section and Elevation. |
plan original | 2 | stage 1 | Non-Standard | Detail Balcony - Mechanics Institute | |||||||
M159 | J.H. Jones | Mechanics Institute - Detail of Front of Roof. | plan original | 2 | Note on Plan: Trusses built on site of oregon beams. They were shipped to Melbourne, then on to Geelong, then carted to Ballarat. | non-current | stage 1 | Non-Standard | Mechanics Institute - Detail of Roof | ||||
M160 | Messrs Cowper Murphy & Assoc. | Proposed Alterations to Mechanics Institute Ballarat Circle Foyer Floor Plan - Scheme 2 |
plan original | 2 | non-current | stage 2 | Non-Standard | Proposed Alterations to Mechanics Institute Ballarat |
|||||
M161 | Mechanics Institute - Details of Entrance - Quarter Full Size | plan original | 2 | stage 1 | Full plan | Mechanics Institute - Details of Entrance - Quarter Full Size |
|||||||
M162 | J.H. Jones | Mechanics Institute - Sketch of Step with ---ing - Cut Bracket | plan original | 2 | non-current | stage 1 | Non-Standard | Mechanics Institute - Sketch of Step with ---ing - Cut Bracket. | |||||
M163 | 28/11/1906 | Type "A" Iron Porticoes for the City of Ballaarat - Showing Detail of Elevation, Skylight, Frieze, Barge & Cap, Section Through Girder, Step in Verandah & Spandrel Filling, Section through Pillar and Plan of Base of Pillar. |
plan original | 2 | Gazetted 28/11/1906. Note: Reverse side of Plan has floor plan for the Municipal Offices. |
non-current | stage 1 | Non-Standard | Type "A" Iron Porticoes for the City of Ballaarat |
||||
M164 | J.H. Jones | 07/09/1969 | Mechanics Institute - Brass Guard-Bars one for each Front | plan original | 4 | Drawing shows Elevation Plan and Section. Handwritten note: 2nd copy. |
non-current | Non-Standard | Mechanics Institute - Brass Guard-Bars one for each Front | ||||
M165 | Gaylord Bros, Inc. | 28/12/1935 | Ballarat Mechanics Institute - Charging Desk. | 4 | 1 | Blueprint drawing showing desk compartments, front panelling and floor plan. | non-current | A1 | Ballarat Mechanics Institute - Charging Desk | ||||
M166 | Coburn & Associates | 01/03/1964 | Odeon Theatre Drawing - Perspective of Facade Drawing of New Verandah for Mechanics Institute |
plan copy | 4 | preliminary | Non-Standard | Drawing for Odeon Theatre Drawing of new Verandah for Mechanics Institute. |
|||||
M167 | Mechanics Institute Facade | plan copy | 4 | preliminary | stage 1 | Non-Standard | Mechanics Institute Facade | ||||||
M168 | 11/06/1969 | Mechanics Institute Entry Design Sketch of Cornice and Light | plan copy | 4 | preliminary | stage 1 | Non-Standard | Mechanics Institute Entry Design Sketch of Cornice and Light. | |||||
M169 | Sketch of Basement Windows | plan copy | 4 | preliminary | stage 1 | Non-Standard | Sketch of Basement Windows | ||||||
M170 | 29/06/1969 | Mechanics Institute Cornice Sketch | plan copy | 4 | preliminary | stage 1 | Non-Standard | Mechanics Institute Cornice Sketch | |||||
M171 | Sketch of Fountain for Mechanics Institute | plan copy | 4 | preliminary | stage 1 | Non-Standard | Sketch of Fountain for Mechanics Institute | ||||||
M172 | Sketch of Skirting for Mechanics Institute | plan copy | 4 | stage 1 | Non-Standard | Sketch of Skirting for Mechanics Institute | |||||||
M173 | 01/01/1934 | New Library Mechanics Institute Plan of Proposed Library in Stock Exchange Building |
plan original | 4 | Proposed plan only - never built as such. | preliminary | stage 1 | Non-Standard | Plan of Proposed Library in Stock Exchange Building titled New Library Mechanics Institute. | ||||
M174 | Messrs Cowper Murphy & Assoc. | Proposed Alterations to Mechanics Institute Ballarat Ground Floor Plan - Scheme 2 |
plan copy | 4 | non-current | stage 1 | Non-Standard | Proposed Alterations to Mechanics Institute Ballarat Ground Floor Plan - Scheme 2 |
|||||
M175 | Mechanics Institute Ballarat - Elevation of Table | plan original | 4 | non-current | stage 1 | Non-Standard | Mechanics Institute Ballarat - Elevation of Table |
||||||
M176 | 28/05/1941 | Britannia Theatre - Ballarat Mechanics Institute Buildings Plan - Circle Entrance - East Side - Scale 1/2" = 1 foot. |
plan copy | 4 | non-current | stage 1 | Non-Standard | Britannia Theatre - Ballarat Mechanics Institute Buildings Plan - Circle Entrance - East Side - Scale 1/2" = 1 foot. |
|||||
M177 | Messrs Cowper Murphy & Assoc. | Survey Plan of Mechanic's Institute Ballaarat Stalls Floor Plan |
plan copy | 4 | non-current | stage 1 | Non-Standard | Survey Plan of Mechanic's Institute Ballaarat Stalls Floor Plan |
|||||
M178 | Messrs Cowper Murphy & Assoc. | Survey Plan Mechanics Institute Ballaarat Gallery Plan |
plan copy | 4 | non-current | stage 1 | Non-Standard | Survey Plan Mechanics Institute Ballaarat Gallery Plan |
|||||
M179 | Mechanics Instituteof Ballarat - Detail Plan of Shelves Elevation of Shelves, Partition between Shelves, Moulding on face of Shelves. |
plan copy | 4 | stage 1 | Non-Standard | Mechanics Institute of Ballarat - Detail Plan of Shelves Elevation of Shelves, Partition between Shelves, Moulding on face of Shelves. |
|||||||
M180 | L.H. Vernon & Associates. Pty Ltd. | 22/10/1997 | Proposed Building Conservation and Development Basement Plan |
plan copy | 4 | B133.1.1 | non-current | stage 1 | Non-Standard | Proposed Building Conservation and Development Basement Plan |
|||
M181 | Ballarat Mechanics Institute Ground Floor Plan |
plan copy | 4 | non-current | stage 1 | Non-Standard | Ballarat Mechanics Institute Ground Floor Plan |
||||||
M182 | Ballarat Mechanics Institute First Floor Plan |
plan copy | 4 | non-current | stage 1 | Non-Standard | Ballarat Mechanics Institute First Floor Plan |
||||||
M183 | Ballarat Mechanics Institute Second Floor Plan |
plan copy | non-current | stage 1 | Non-Standard | Ballarat Mechanics Institute Second Floor Plan |
|||||||
M184 | 11/06/1869 | Drawing of Ceiling Light | plan copy | 4 | stage 1 | Non-Standard | Drawing of Ceiling Light | ||||||
M185 | 01/01/1868 | Sketch of Step - with awning - cut Bracket etc | drawing hand | 4 | non-current | Non-Standard | Sketch of Step - with awning - cut Bracket etc | ||||||
M186 | 06/02/1869 | Mechanics Institute - Cornice over Mezzanine Floor | plan copy | 4 | stage 1 | Non-Standard | Mechanics Institute - Cornice over Mezzanine Floor | ||||||
M187 | Sketch of Elaborate Cornice - showing face of work | plan copy | 4 | non-current | stage 1 | Non-Standard | Sketch of Elaborate Cornice - showing face of work | ||||||
M188 | Messrs Cowper Murphy & Assoc. | Survey Plan Mechanics Institute Ballaarat Longitudinal Section showing Stage, Auditorium and Dancing School |
plan copy | 4 | non-current | stage 1 | Non-Standard | Survey Plan Mechanics Institute Ballaarat Longitudinal Section showing Stage, Auditorium and Dancing School |
|||||
M189 | J.H. Jones | 25/05/1869 | Sketch of Ornamental Cornice and Elaborate surround of window. | plan copy | 4 | non-current | stage 1 | Non-Standard | Sketch of Ornamental Cornice and Elaborate surround of window. Plaster Mould |
||||
M190 | 11/08/1869 | 4 | Non-Standard | Half Size sketch of Cornice and elaborate Stair Railings | |||||||||
M191 | Sketch of Elaborate Cornice | plan copy | 4 | non-current | stage 1 | Non-Standard | Sketch of Elaborate Cornice - Plaster Mould | ||||||
M192 | 29/06/1869 | Sketch of Cornice | plan copy | 4 | non-current | Non-Standard | Sketch of Cornice | ||||||
M193 | 17/05/1869 | Sketch including Cup Mould | plan copy | 4 | stage 1 | Non-Standard | Sketch including Cup Mould | ||||||
M194 | "Plan of Platform including Stairs" - Ballarat Mechanics Institute. | plan copy | 4 | non-current | stage 1 | Non-Standard | "Plan of Platform including Stairs" - Ballarat Mechanics Institute. | ||||||
M195 | Mechanics Institute - Details of Entrance - Quarter Full Size | plan copy | 4 | non-current | stage 1 | Non-Standard | Mechanics Institute - Details of Entrance | ||||||
M196 | Plan for Mechanics Institute including Ground Floor First Floor with two offices in front and a hall at back Gallery Floor with Billiards Room above |
4 | non-current | stage 1 | Non-Standard | Plan for Mechanics Institute including Ground Floor First Floor with two offices in front and hall at back Gallery Floor with Billiard Room above |
|||||||
M197 | Early plan of Mechanics Institute Hall - featuring Stage, Inspection Chamber and Exit from Stalls. | plan copy | 4 | non-current | Non-Standard | Early plan of Mechanics Institute Hall. | |||||||
M198 | 01/01/1868 | Early Building Plan of Mechanics Institute - Ground, First and Gallery Floors. | plan copy | 4 | non-current | Non-Standard | Early Building Plan of Mechanics Institute - Ground, First and Gallery Floors. | ||||||
M199 | 01/01/1919 | Plan of Top Floor of the Britannia Theatre | 4 | non-current | Non-Standard | Plan of Top Floor of the Britannia Theatre | |||||||
M200 | Clegg & Morrow | Ballarat Mechanics Institute - Annexe of Backstage over the footpath Features Dressing Rooms, Stage and Auditorium. |
plan copy | 4 | non-current | Non-Standard | Ballarat Mechanics Institute - Annexe of Backstage over the footpath Features Dressing Room, Stage and Auditorium |
||||||
M201 | Sketch of Elaborate Plaster Mould | plan copy | 4 | non-current | stage 1 | Non-Standard | Sketch of Elaborate Plaster Mould | ||||||
M202 | View of Shelves in Relation to Lighting Fitting. Sketch of Proposed Fitting for Library. |
plan copy | 4 | Coloured Sketches. Note at base of sketches - State Electricity Commission of Victoria. Electricity Supply Department - Electrical Development Branch. |
non-current | stage 1 | Non-Standard | View of Shelves in Relation to Lighting Fitting. Sketch of Proposed Fitting for Library. |
|||||
M203 | Messrs Cowper Murphy & Assoc. | Proposed Alterations to Mechanics Institute Ballarat - Scheme 2. New Section to Roof, Bio Box, Auditorium, Foyer, Reading Room, Corridor & Entrance Foyer. |
plan original | 4 | stage 1 | Non-Standard | Proposed Alterations to Mechanics Institute Ballarat - Scheme 2. | ||||||
M204 | HBO+EMTB | 19/05/2009 | Proposed Back Stage - Store & Access Auditorium Level Auditorium Auditorium Ramp Access Ramp Ref. No: 001093 |
plan copy | 4 | F-01 | M204a & M204b show more detail of the auditorium - Drawing No: SKO4. Related record - M206. |
preliminary | theatre | A4 | Proposed Back Stage - Store & Access | ||
M205 | Morton Dunn | 10/10/2011 | Plan of Feature & Level Survey | plan copy | 4 | FS01-01 | NOTE: Adam Edward Criddle of TGM Group 1315 Sturt Street Ballarat 3350, certify that this plan is in all respects accurate conditions on the 10-10-2011. Licensed Surveyor. |
preliminary | stage 2 | A3 | Plan of Feature & Level Survey | ||
M206 | HBO+EMTB | 01/01/2009 | Proposed Access Ramp to Back Stage - Plan Option B Drawings: SK-05 and SK-06. Ref: 001093 |
drawing hand | 4 | SK-05 & SK-06 | M206a - Plan Option B. Drwg: SK-05 M206b - Section A-A Option B. Drwg: SK-06 Related Record - M204. |
preliminary | theatre | A3 | Proposed Access Ramp to Back Stage - Option B | ||
M207 | Morton Dunn | 01/11/2006 | Sections & Roof Plan | plan copy | 4 | WDA 08 | This is a related copy of M28 Endorsed copy. | preliminary | stage 1 | Full plan | Sections & Roof Plan | ||
M208 | Morton Dunn | 01/11/2006 | Internal Elevations 1 | plan copy | 4 | WDA 09 | This is a preliminary copy of M29 Endorsed copy | preliminary | stage 1 | Full plan | Internal Elevations 1 | ||
M209 | Morton Dunn | 01/11/2006 | Reflected Ceiling & Roof Plans | plan original | 4 | WDA 06 | Related copy of M26 Endorsed Plan. | preliminary | stage 1 | Full plan | Reflected Ceiling & Roof Plans | ||
M210 | Morton Dunn | 01/11/2006 | Sections Elevation - North (external), West (external), & South Sections - Elevation Cutaway, North Elevation Tea Room. |
plan original | 4 | WDA 07 | This is a related copy of M27. | preliminary | stage 1 | Full plan | Sections | ||
M211 | Morton Dunn | 01/11/2006 | Internal Elevations 2 & Stair Plans Lift Foyer - Floor Level 1, Internal Elevation - stairs, Lift Foyers Levels 0 - 3, Stair Plans - ground floor, first floor, second floor, third floor. |
plan original | 4 | WDA 10 | Related copy M30 - Endorsed. | preliminary | stage 1 | Full plan | Internal Elevations 2 & Stair Plans | ||
M212 | Morton Dunn | 01/11/2006 | Internal Elevations 3 - Tea Room - Staff WC - Lift Foyer - Ground Floor, Floor Leval 1a - South Foyer 2, East Foyer 2, North Foyer 2, - Female WC east (a), east (b), south (a), south (b), Male WC South dis. WC, west, north, Tea Room 2, Auditorium |
plan original | 4 | stage 1 | Full plan | Internal Elevations 3 | |||||
M213 | Morton Dunn | 28/11/2006 | Internal Elevations 4 & Details | plan original | 4 | WDA 12 | preliminary | stage 1 | Full plan | Internal Elevations 4 & Details Sutton Room |
|||
M214 | MacLeod Consulting | 01/08/2006 | Ground and First Floor Level Works | plan original | 4 | S02 | Related copy M34. | preliminary | stage 1 | Full plan | Ground and First Floor Level Works | ||
M215 | 01/08/2006 | Second and Third Floor Level Works | plan original | 4 | S03 | preliminary | stage 1 | Full plan | Second and Third Floor Level Works | ||||
M216 | MacLeod Consulting | 01/08/2006 | Building Sections | plan original | 4 | S04 | Related copy M36. | preliminary | stage 1 | Full plan | Building Sections | ||
M217 | Morton Dunn | 01/11/2006 | Proposed Ground & First Floor Plans | plan original | 4 | WDA 04 | Related copy M24. | preliminary | stage 1 | Full plan | Proposed Ground & First Floor Plans | ||
M218 | Morton Dunn | 01/11/2006 | Demolition Ground & First Floor Plans | plan original | 4 | WDA 01 | Related copy M21. | preliminary | stage 1 | Full plan | Demolition Ground & First Floor Plans | ||
M219 | 11/04/1868 | Mechanics Institute Alterations and Additions to Plans | plan original | 4 | Archives record 13911 - handwritten notes re drawing and printed "Competitive Designs" for the new building to be erected on the frontage to Sturt Street are invited under the following conditions. Original drawing in maps drawer, |
preliminary | stage 1 | Non-Standard | Mechanics Institute Alterations and Additions to Plans | ||||
M220 | MacLeod Consulting | 01/05/2011 | Alterations and additions to stage area for Ballarat Mechanics Institute Structural Drawings S01-S07. |
plan copy | 4 | S01-S07 | Twelve pages to this entry. | non-current | theatre | A3 | Alterations and additions to stage area for Ballarat Mechanics Institute | ||
M221 | HBO+EMTB | Ballarat Mechanics Institute Proposed Back Stage Store & Access | plan copy | 4 | SKO4 | non-current | theatre | A4 | Ballarat Mechanics Institute Proposed Back Stage Store & Access | ||||
M222 | Morton Dunn | 19/10/2011 | Existing first floor plan Drawing of BMI Auditorium and Stage area |
plan copy | 4 | EC-01 | Related Record M223 | non-current | theatre | A3 | Ballaarat Mechanics' Institute Existing first floor plan of Auditorium and Stage |
||
M223 | Morton Dunn | 19/10/2011 | Proposed First Floor Plan M223a - option 1 M223b - option 2 M223c - option 3 |
plan copy | 4 | SK-01-03 | Related Record M222 | non-current | theatre | A3 | Ballaarat Mechanics' Institute Proposed First Floor Plan - options 1, 2, 3 |
||
M224 | Wendy Jacobs | 01/03/2004 | Mechanics Institute Ballarat Heating System - Panel Radiation Layout |
plan copy | 4 | 08019 - M1 | non-current | stage 1 | A3 | Mechanics Institute Ballarat Heating System - Panel Radiation Layout |
|||
M225 | Wendy Jacobs | 01/03/2004 | Mechanics Institute Ballarat Heating System - Details |
plan copy | 4 | 08019 - M2 | non-current | stage 1 | A3 | Mechanics Institute Ballarat Heating System - Details |
|||
M226 | Wendy Jacobs | 01/03/2004 | Mechanics Institute Ballarat Heating System - Pipe Schematic |
plan copy | 4 | 08019 - M3 | non-current | stage 1 | A3 | Mechanics Institute Ballarat Heating System - Pipe Schematic |
|||
M227 | Wendy Jacobs | 01/03/2004 | Mechanics Institute Ballarat Heating System - Legend & Notes |
plan copy | 4 | 08019 - M4 | non-current | stage 1 | A3 | Mechanics Institute Ballarat Heating System - Legend & Notes |
|||
M228 | HBO+EMTB | Ballarat Mechanics Institute Floor Plan Ground & First Level |
plan copy | 4 | A03 | Job No: MEA-1093 | preliminary | stage 1 | Full plan | Ballarat Mechanics Institute Floor Plan Ground & First Level |
|||
M229 | Morton Dunn | Mechanics Institute Ballarat Ground Floor Plan First Floor Plan |
plan copy | 4 | preliminary | stage 1 | Non-Standard | Mechanics Institute Ballarat Ground Floor Plan First Floor Plan |
|||||
M230 | Morton Dunn | Ballarat Mechanics Institute Plan of South Elevation |
plan copy | 4 | preliminary | stage 1 | Non-Standard | Ballarat Mechanics Institute Plan of South Elevation |
|||||
M231 | Morton Dunn | Ballarat Mechanics Institute Section Drawing - Section CC Section Drawing - Section BB |
plan copy | Section CC shows Auditorium, Service Area & Courtyard. Section BB shows New Back Stage & Auditorium. |
preliminary | stage 1 | Ballarat Mechanics Institute Section Drawing Section CC Section Drawing Section BB |
||||||
M232 | 4 | Non-Standard | Ballarat Mechanics Institute |
||||||||||
M233 | Morton Dunn | 14/10/2011 | Ballarat Mechanics Institute Internal Elevations (existing) - East, South & West. |
plan copy | 4 | stage 1 | Non-Standard | Ballarat Mechanics Institute Internal Elevations (existing) - East, South & West. |
|||||
M234 | Morton Dunn | Ballarat Mechanics Institute Proposed Option A Plan Proposed Option B Plan Proposed Option A Elevation Proposed Option B |
plan copy | 4 | non-current | stage 1 | Full plan | Ballarat Mechanics Institute Proposed Option A Plan Proposed Option B Plan Proposed Option A Elevation Proposed Option B |
|||||
M235 | W. Baragwanath | 1.0 | 01/12/1911 | Cover envelope containing 32 Plates Map, Sections, and Plans. The Ballarat Gold-Field, Memoir No. 14 | Historical Geological Survey | 7 | cover | Missing from Cover envelope. Plate no. 7A, 11, 19, 20, 29. | Geological Survey | Geological Survey | A4 | Unknown | Geological Survey of Victoria, The Ballarat Gold-Fields |